FBO DAILY - FEDBIZOPPS ISSUE OF JULY 24, 2013 FBO #4260
SOLICITATION NOTICE

Y -- Road 2511 Decommissioning - Project Maps and Drawings (DRAFT)

Notice Date
7/22/2013
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-13-0031
 
Point of Contact
Brian A. Johnson, Phone: (425) 783-6056, Jim Mitchell, Phone: 360-854-2620
 
E-Mail Address
bajohnson03@fs.fed.us, jbmitchell@fs.fed.us
(bajohnson03@fs.fed.us, jbmitchell@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Project Maps and Drawings (DRAFT) PROJECT DESCRIPTION Road 2511 Decommissioning Project -FSR 2511 MP 0.00 - 0.753 Decommissioning - This project includes but is not limited to removal of all culverts and the construction of drainage features for the purposes of placing this road into Decommission status. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required according to the drawings and specifications of the contract. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract. PROJECT LOCATION From Darrington, WA, proceed Northerly on State Route 530 approximately 7.5 miles to the junction of Forest Road 26, Suiattle, on the right. Proceed Easterly on Road 26 for 10 miles to the junction of Forest Road 25 on the right. Proceed Southerly on Road 25 for 0.9 miles to the junction of Forest Road 2510 MP 0.0 on the right. Proceed 0.61 miles on Road 2510 to intersection of Road 2511 where the decommissioining project begins in Township 32 N, Range 11 E, Section 7 (North half). A District map showing the road system is available for viewing at the district office. PLANS, SPECIFICATIONS, AND DRAWINGS Maps and drawings for this project are attached and are for information only. The final maps/drawings will be issued with the formal solicitation. PERIOD OF PERFORMANCE Thirty (30) calendar days from the Notice to Proceed. DESIRED START DATE September 2013. PRE-BID MEETING A pre-bid meeting will not be held and project bidders are advised to visit the project site prior to bidding to be familiar with the project's road system and the access to each roads work area. DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION PROJECT (FAR 36.204) Between $25,000 and $100,000. BONDING REQUIREMENTS Will be detailed in the formal solicitation when issued. DATE SOLICITATION WILL BE ISSUED On or around 15 calendar days from the date the FBO presolicitation notice issuance. POINTS OF CONTACT Business: Brian Johnson, (425) 783-6056, bajohnson03@fs.fed.us Technical: Jim Mitchell, (360) 854-2620, jbmitchell@fs.fed.us
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-13-0031/listing.html)
 
Place of Performance
Address: Mt. Baker Snoqualmie National Forest, 2930 Wetmore Ave., Suite 3A, Everett, Washington, 98201, United States
Zip Code: 98201
 
Record
SN03123277-W 20130724/130722234821-39c5539e7321b1281130fc3e9d5b886c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.