AWARD
Y -- Design Build, the C-130J Fuel Systems Maintenance Hangar Construction project at Little Rock AFB, AR.
- Notice Date
- 6/25/2013
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Little Rock, 700 West Capitol, Little Rock, AR 72201
- ZIP Code
- 72201
- Solicitation Number
- W9127S13R6002
- Response Due
- 11/19/2012
- Archive Date
- 7/25/2013
- Point of Contact
- Alicia Moore, 501-340-1262
- E-Mail Address
-
USACE District, Little Rock
(alicia.m.moore@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W9127S13C6002
- Award Date
- 6/25/2013
- Awardee
- Ross Group Construction Corporation, The (967886425) <br> 10159 East 11th Street Suite 200 <br> Tulsa, OK 74128-3044
- Award Amount
- $20,869,000.00
- Line Number
- 0001, 0002
- Description
- The Scope of Work includes, but is not limited to the construction of a two bay fuels maintenance hangar with reinforced concrete drilled pier foundation and structural slab on grade. Structural steel superstructure insulated metal siding with sloped-standing seam metal roof. Dirty locker rooms and clean locker rooms with showers in between. Other personnel space includes offices training rooms and break rooms. All interior finishes, plumbing fixtures/equipment, mechanical systems, electrical equipment/distribution, communication systems, lighting systems, fire protection systems, and fuel vapor sensing, alarm and exhaust system, fall protection, wash down drainage trenches, monorail hoist system and necessary support/work associated with this project. Room for maintenance and repair of fuel tanks and bladders, room for CTK and rails. Includes pavements for 70 parking spaces, site utilities, and site improvements. Also includes demolition of two substandard B-58 Hustler nose docks, two small buildings, 50 parking spaces, move a pavilion, and movement of a de-icer storage facility. Provides temporary facility for CTK/rails until hangar is completed. Project includes minimum DoD Force Protection, Leadership in Energy and Environmental Design (LEED) standards and a storm water retention system. The project will be designed and certified to the LEED Silver in accordance with the U.S. Green Building Council (USGBC) program requirements. In addition, the project has been selected by the Air Force as a potential demonstration project for a Zero Net Energy (ZNE) facility. The following parameters will be used as the current Air Force MILCON baseline for energy compliance: - Energy Policy Act of 2005 (EPAct 2005) requirement to meet ASHRAE 90.1 2007 30% energy reduction mandate. - LEED Silver Certification. - Energy Independence and Security Act of 2007 (EISA 2007) requirements to achieve a 55% reduction in the use of fossil fuels. This is a design build project. Work shall be performed in accordance with the terms and conditions of any resultant contract.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA03/W9127S13R6002/listing.html)
- Record
- SN03098581-W 20130627/130625234617-b79ce45124f51bf3ce9e601a6a908003 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |