Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 25, 2013 FBO #4200
SOLICITATION NOTICE

F -- Yeti Stewardship

Notice Date
5/23/2013
 
Notice Type
Presolicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
Department of Agriculture, Forest Service, R-5, Central CA Acquisitions Service Area, Tahoe N.F., 631 Coyote Street, Nevada City, California, 95959-2250, United States
 
ZIP Code
95959-2250
 
Solicitation Number
AG-9A63-S-13-0152
 
Archive Date
8/30/2013
 
Point of Contact
Donald Tinsley, Phone: 530-252-6407, Kimberly Schneider, Phone: 530-478-6829
 
E-Mail Address
dtinsley@fs.fed.us, krschneider@fs.fed.us
(dtinsley@fs.fed.us, krschneider@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
PROJECT DESCRIPTION The solicitation and any resultant contract will be a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res. 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec. 347. This is a commercial item acquisition that has been tailored to fit the Government's method of trading goods for services. Work includes 4 mandatory activity bid items that will be treated in addition to thinning and removal of commercial sawlogs on 418 acres. These stewardship work activity items will be described in detail in Appendix A and attachments when solicitation is posted. Treatment areas consist of natural stands. The intent of the Yeti CTL contract is to accomplish stand treatments specifically, the reduction of standing vegetation fuel ladders, tree thinning, treatment of standing dead and down material, removal of biomass and small sawlog material, mastication or chipping of slash, and associated erosion control and road maintenance work. It is the intent of this contract to either remove or dispose of as much slash generated from operations as possible so as to limit the amount of post contract government slash burning. Masticating or chipping of activity slash and other biomass or whole tree removal of small trees and top portions and limbs of larger trees to landing will be required. Slash that is yarded to landings (limbs, tops, small boles) shall be removed from site or chipped and removed by Contractor. Landing slash disposal will be the responsibility of the Contractor. Any resultant contract will be a Commercial Service contract with provisions for timber removal. PROJECT LOCATION The project area (418 acres) is located on the South Shore of Lake Tahoe near S. Lake Tahoe High School, and on the North Shore of Lake Tahoe near Kings Beach. The legal locations are: T.12N, R.18E, Sec.8, and T.16N, R.18E, Sec.18, MDB&M, Mount Diablo Base and Meridian (MDB&M). All treatment areas are between elevations of approximately 6,300 feet-7150 feet. Access to the South Shore units is from Lake Tahoe Blvd., Tahoe Mountain Rd., and Forest Roads 12N28 and 12N31. Access to the North Shore units is from Hwy 28 and 267, Beaver St., Forest Road 16N86, Cambridge Dr., and Hastings Ln. The solicitation package will be uploaded approximately June 6, 2013. Please hold any technical questions until after review of the solicitation. The technical contact information will be listed in the solicitation.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/9A63/AG-9A63-S-13-0152/listing.html)
 
Place of Performance
Address: Lake Tahoe Basin Management Unit, California, United States
 
Record
SN03071174-W 20130525/130524000043-5e0ff5fa597c5ee9c4bc3b31b5eece0b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.