MODIFICATION
54 -- GREEN FOREST-POPLAR BLUFF-ASHERVILLE STEEL STRUCTURES
- Notice Date
- 5/9/2013
- Notice Type
- Modification/Amendment
- NAICS
- 332312
— Fabricated Structural Metal Manufacturing
- Contracting Office
- SWPA (Tulsa)U.S. DEPT OF ENERGYSOUTHWESTERN POWER ADMINISTRATIONONE WEST THIRD STREETTulsaOK74103-3502US
- ZIP Code
- 00000
- Solicitation Number
- DE-SOL-0005544
- Point of Contact
- Sean L. Long
- Small Business Set-Aside
- N/A
- Description
- The specificationd are general enough that to cover slip or flange joints. The drawings show flanged joints and that is what is required for this procurement. QUESTIONS AND ANSWERS: 1. Will Smooth Round poles will be a considered as an alternative to 12-sided hexagonal poles. ANSWER = NO. 2. The Quantity of poles in the bid schedule differs from the quantities listed on the engineered drawings. ANSWER = Use the quantities of poles listed in the BID SCHEDULE. 3.The ground sleeve in the drawing is shown at 7?-0 long that is, 5?-0 above grade and 2?-0 below grade. The bid description schedule calls out a 5?-0 ground sleeve 3?-0 above grade and 2?-0 below grade. ANSWER = Use the sleeve lengths specified in the SPECIFICATIONS.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0005544/listing.html)
- Record
- SN03057681-W 20130511/130509234737-f3fc4e9922dcf278b2379a108907f6f3 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |