Y -- Mississippi River, Pool 12 Islands-Sunfish Lake, Jo Davies County, IL, Pool 12 Overwintering HREP, Stage I

Notice Date
2/12/2013
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
 
ZIP Code
61204-2004
 
Solicitation Number
W912EK-13-B-0004
 
Response Due
2/19/2013
 
Archive Date
4/13/2013
 
Point of Contact
Brunson Grothus, (309)794-5241
 
E-Mail Address
USACE District, Rock Island
(brunson.e.grothus@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The US Army Corps of Engineers Rock Island District is seeking small business concerns capable of providing mechanical dredging services on the Mississippi River in the Sunfish Lake backwater area to create overwintering habitat. The work consists of, but is not limited to: furnishing all plant, labor material, and equipment necessary for mechanical dredging 230,000 CY of a channel in Sunfish Lake (approximately 12,000 linear feet) and transporting to dredged material placement sites. Only river access is available and hydraulic dredging is not an option. The channel would have a bottom width of 60 feet and 3H:1V side slopes, with dredging performed to a depth of 584 ft MSL, 8 feet below flat pool elevation. All dredged material shall be placed within an average placement site of 100 feet next to the dredged channel, see attached site plan. The placement site starts at least 30 feet from the dredge channel. An equipment reach capacity of up to 110 feet may be necessary. A rock closure structure (approximately 4200 tons of riprap) will also be constructed to reduce water velocity near the entrance of the backwater area. The placement sites shall be cleared of trees, stumps, down timber, brush, and other debris above the ground surface that would interfere with placing the dredged material. No clearing of trees with peeling bark greater than 4 inches in diameter shall be allowed between April 1 and September 30 inclusive (the Indiana bat roosting season). The material to be removed is primarily soft to very stiff silts, sands, and clays. The entire project site is within the Mississippi River and is therefore highly susceptible to water fluctuations that may impact work progress. No physical work at the project site shall be required 1 December through 15 March. Standby cost will not be paid. Lastly, underwater excavation will not be allowed when water level is above Elevation 595.0. Hydraulic data for this project can be obtained from the web site as follows: go to http://www.rivergages.com; choose Rock Island District; choose Mississippi River and Passes; Click on quote mark Mississippi River Lock and Dam 12 (Bellevue, IA) quote mark and continue to navigate for the details required. This project will have a base bid with approximately 95,000 CY with three options ranging from 25,000 CY to 60,000 CY. This construction project has an estimated range of $5 to $10 million. The construction of this project is anticipated to take multiple years depending on the options awarded. The North American Industry Classification Standard (NAICS) Code is 237990, Other Heavy and Civil Engineering Construction with a corresponding size standard of $20 Million for Dredging and Surface Cleanup Activities. NAICS code 237990 - Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern. All interested small business concerns are encouraged to respond to this Sources Sought Notice. Contractors are reminded that THIS SOURCES SOUGHT NOTICE IS NOT AN INVITATION FOR BID OR REQUEST FOR PROPOSAL. It is a market research tool being used to determine the availability and adequacy of potential Small Business Concerns prior to determining the method of acquisition. Responses to this Sources Sought Notice shall not constitute responses to the solicitation, which is not currently available. This Sources Sought Notice is not to be construed as a commitment by the Government, nor will the Government pay for the information submitted in response. Upon review of industry response to this Sources Sought Notice, the Government will determine whether a set-aside acquisition is in the Government's best interest. Please email the following documentation to the Point of Contact listed below. 1.) Relevant experience in performing efforts of similar size and scope to that of the project description above within the last five (5) years. 2.) A list of equipment (plant type, size, etc) the contractor is proposing to use. Email responses with the information required above must be sent to Brunson.E.Grothus@usace.army.mil no later than 2:00 PM Central Standard Time on 19 February 2013. If you have any questions or comments regarding this notice, please contact Mr. Brunson Grothus at (309)794-5241 or by email at Brunson.E.Grothus@usace.army.mil
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/W912EK-13-B-0004/listing.html)
 
Place of Performance
Address: USACE Rock Island District Mississippi River, Pool 12 Islands-Sunfish Lake Jo Davies County IL
Zip Code: N/A
 
Record
SN02985428-W 20130214/130212234337-dea8ab45745f2f6772929f14a018e13d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.