Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 30, 2012 FBO #4054
AWARD

Z -- Martin County Shore Protection Project, Beach Renourisment 2013, Hutchinson Island, Martin County, Florida

Notice Date
12/28/2012
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
GROUP1-10-R-J009
 
Archive Date
1/27/2013
 
Point of Contact
Ian McClary, 904-232-2179
 
E-Mail Address
USACE District, Jacksonville
(ian.r.mcclary@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-11-D-0004-0005
 
Award Date
12/17/2012
 
Awardee
GREAT LAKES DREDGE & DOCK COMPANY, LLC (006930358) <br> 2122 YORK RD STE 200 <br> OAK BROOK, IL 60523-1930
 
Award Amount
$8,412,700.00
 
Line Number
0001-0009
 
Description
The proposed project is to construct beach nourishment along 4 miles of the Atlantic Ocean shoreline commencing south from the northern boundary of Martin County between the FDEP reference monuments R-1 through R-25. The approved historical beach fill template included a 9O-foot wide berm at Elevation +6.5 NAVD 88. The constructed foreshore slope would be 1:10. At the south of the project, the beach tapers to the existing profile at monument R-25. The beach fill design also includes a 65-foot wide dune feature that has a 20-foot wide crest at Elevation +11.0 NAVD 88. For this project, the Contractor shall construct alternate equal-length segments of shoreline using the historical template mentioned above with an experimental construction template. The experimental or turtle-friendly template would begin at the design toe of the dune at Elevation +6.5 NAVD 88. The design beach profile would slope at 1 on 50 to Elevation +5.5 NAVD 88 (50-foot wide). From this point, the turtle-friendly profile shall slope at 1 on 20 to mean low water (Elevation +2.6 NAVD 88). This experimental segment of fill shall also include the dune feature as specified above. The distance from R-1 to R-25 is approximately 21,600 feet. Each 2000-foot segment shall be separated by a 700-foot transition. The north limit of the project shall transition into the existing beach profile at R-1 with a 200-foot taper.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/GROUP1-10-R-J009/listing.html)
 
Record
SN02956724-W 20121230/121228233910-f335b441e318d164737c32c2dff713ec (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.