Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 27, 2012 FBO #3990
SOLICITATION NOTICE

Y -- NV PFH 11-1(5) Kyle Canyon Road

Notice Date
10/25/2012
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-12-B-00014
 
Archive Date
12/31/2012
 
Point of Contact
Marilyn Dodson, Phone: 7209633090, Jeremiah B. Rogers, Phone: 7209633090
 
E-Mail Address
marilyn.dodson@dot.gov, jeremiah.rogers@dot.gov
(marilyn.dodson@dot.gov, jeremiah.rogers@dot.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Location: Nevada Forest Highway (FH) 11 is located in Clark County in southern Nevada near Las Vegas. The route is also designated as State Route 157 (SR-157) and is also known as the Kyle Canyon Road. The route begins at the west end of the route near Cathedral Rock Picnic Area and proceeds easterly 21.25 miles on SR-157 to a junction with US-95 northwest of Las Vegas. This project is between milepost 4.4 to 5.2. Significant items and quantities: Project will involve the full reconstruction of the roadway including two roundabouts and a median. Work will include excavation, drainage, asphalt paving, concrete work, waterline, survey, erosion control, permanent and temporary traffic control, and revegetation. Major approximate quantities include: •- 40,000 cubic yards of Excavation •- 40,000 feet of Pulverizing •- 10,500 tons of Aggregate Base •- 5,000 tons of HACP Pavement •- 5,000 square yards of Reinforced Rigid Concrete Pavement •- 300 linear feet of Culverts •- 10,000 linear feet of Curb and Gutter •- 5,600 linear feet of PVC Waterline, 8 inch Work along this route will take place within environmentally sensitive areas and will require interactions with the Forest Service (FS), Nevada Department of Transportation (NDOT), and the travelling public. Traffic control during construction will be very important and will be coordinated with FHWA and NDOT. The FS will also be constructing the Middle Kyle Complex Visitor's Center at this location during this time period. Close coordination with contractor's from that project will be necessary. Project will be bid with A+B bidding with a range of 90 to 150 days. The anticipated cost range is $3,000,000 to $6,000,000. It is anticipated that this project will be advertised in middle to late November 2012.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00014/listing.html)
 
Place of Performance
Address: Mt. Charleston, Nevada, 89124, United States
Zip Code: 89124
 
Record
SN02919779-W 20121027/121025234618-4f812d79c4a31103ce1f9fcafbaef37c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.