MODIFICATION
56 -- Orwell Dam Roof Insulation - Amendment 1
- Notice Date
- 9/14/2012
- Notice Type
- Modification/Amendment
- NAICS
- 238310
— Drywall and Insulation Contractors
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, St. Paul, Attn: CEMVP-CT, 180 East Fifth Street, St. Paul, Minnesota, 55101-1678, United States
- ZIP Code
- 55101-1678
- Solicitation Number
- W912ES-12-T-0180
- Archive Date
- 10/4/2012
- Point of Contact
- Jesse Onkka, Phone: 6512905444, Gwendolyn Davis, Phone: 6512905723
- E-Mail Address
-
Jesse.L.Onkka@usace.army.mil, gwendolyn.k.davis@usace.army.mil
(Jesse.L.Onkka@usace.army.mil, gwendolyn.k.davis@usace.army.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- SF-30 SCOPE OF WORK Roof insulation project for Orwell Dam Shop Building. SOW Apply a minimum of 2 inches of closed cell sprayed polyurethane foam (SPF) insulation for roofing onto a corrugated steel roof that measures approximately 16 feet to peak with a length of 40 feet for each side of the roof. Approximate total roof area is 1280 square feet. Contractor is responsible determining the actual measurements to ensure the project is completed satisfactorily. Complete roof preparation according to manufacturers specifications to include at least washing the surface and prime any rusted areas. The spray foam must be applied in a seamless/fully adhered fashion and according to manufacturer's recommendation. The spray foam must be rated with a service life of 20 plus years and have an R value of at least 6+/inch and have a Density Property (pcf) value greater than 2.7 using test method ASTM D 1622. Apply a protective elastomeric moisture-cure silicone rubber roof coating system that is vapor permeable having the ability to "breathe" designed for use over spray-in-place polyurethane foam with embedded standard roofing granules in stages according to manufacturer's instructions to provide a tensile strength of at least 225 PSI at 75 degrees Fahrenheit using test method ASTM D-412, with a permeability greater than 4 using test method ASTM E-96, Procedure B and with the minimum combined cured thickness of basecoat(s) and topcoat of at least 15 mils. First stage(s) will be grey and the final stage will be white without any grey showing. The applicator must show proof of certification of training to apply the material used. EM 385-1-1, Corps of Engineers Safety Manual guidelines will be adhered to during the duration of the contract. DELIVERY DUE DATE Completion date of October 19, 2012. SHIPMENT U.S. Army Corps of Engineers Orwell Dam 14780 Orwell Road Fergus Falls, MN 56537 Attn: Bob Schimming 218-736-6463 Contractor shall provide a 1-year warranty of the product and any Manufacturer's standard commercial warranty for the project that exceeds the 1-year minimum.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA37/W912ES-12-T-0180/listing.html)
- Place of Performance
- Address: Minnesota, United States
- Record
- SN02883094-W 20120916/120914235940-87d9091d5c3fb27fdf07810c2df3d9c0 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |