Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 14, 2012 FBO #3947
MODIFICATION

Z -- Demolition Project

Notice Date
9/12/2012
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
Department of the Air Force, Air Combat Command, 99 CONS, 5865 Swaab Blvd, Nellis AFB, Nevada, 89191-7063, United States
 
ZIP Code
89191-7063
 
Solicitation Number
FA4861-12-B-0002
 
Archive Date
10/2/2012
 
Point of Contact
Neil E. Armstrong, Phone: 7026529564
 
E-Mail Address
neil.armstrong@nellis.af.mil
(neil.armstrong@nellis.af.mil)
 
Small Business Set-Aside
Woman Owned Small Business
 
Description
The following questions were submitted to the Government: 1. Looking at the file 'DEMOLITION_PLAN.pdf' you have existing fencing, and need us to install newly added fence with wind screen. Do we estimate exact location from the yellow line, indicating future fence? Should we estimate to add fencing around corner playground for Grading? The yellow line indicates where permanent fencing should be once the construction portion of the project is complete. The entire work area, including the grading area, will need to be fenced off by temporary fencing with visual screening for the duration of the project. 2. Fencing with wind screen requires concrete footed posts in ground, (not a footing base above ground) will this be approved and excepted? Will subcontractor installed fence be permanent, temporary or (temporary then install permanent)? Requirements: 6' or 8' Temp or perm, wind screen Beige or green? Visual screen fencing is temporary and does not need to be secured by concrete-footed posts. However, fabric should have holes cut in it to prevent wind from blowing the fence over. If installing on an unpaved surface, posts are to be driven into the ground and affected landscaping restored upon removal. On paved surfaces, posts may be secured using sandbags. Temp fence shall be 6' tall and have tan fabric visual screening. 3. Do the existing side walk need demolition? Pour Back? These questions where not asked at job walk. Do block wall need demolition? At building 601, the existing perimeter sidewalk and the block wall do not need to be demolished. Sidewalks providing access to the building or to play areas in the back are to be demolished. 4. Need to locate 299 Area 3 for relocating of existing exterior Freezer unit. Is a dedicated circuit needed? What is the amp ridge? Is there space on existing electrical panel? Building 2999 in Area III was the last stop during the site visit last week. A dedicated 30-amp circuit is needed for the freezer unit, and there is space on the existing electrical panel at building 2999.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/99CONS/FA4861-12-B-0002/listing.html)
 
Place of Performance
Address: Nellis AFB, Nevada, 89191, United States
Zip Code: 89191
 
Record
SN02878788-W 20120914/120912235914-9aa702a0ab64f131ebfd598dc65d0d21 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.