Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 30, 2012 FBO #3932
AWARD

Z -- OMAHA DISTRICT - Dredging of the Oahe Emergency Spillway Inlet

Notice Date
8/28/2012
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Galveston, 2000 Fort Point Road, PO Box 1229, Galveston, TX 77553-1229
 
ZIP Code
77553-1229
 
Solicitation Number
W912HY-12-B-0012
 
Response Due
7/18/2012
 
Archive Date
9/27/2012
 
Point of Contact
Sara Jackets, 402-995-2424
 
E-Mail Address
USACE District, Galveston
(sara.l.jackets@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9128F-12-C-0039
 
Award Date
8/28/2012
 
Awardee
ROAD BUILDERS, INC. (090339750) <br> 241 W 35TH ST STE C<br> NATIONAL CITY, CA 91950-7920
 
Award Amount
$2,377,080.00
 
Line Number
Items 0001 -0011
 
Description
The work under this contract includes the hydraulic dredging of sedimentation from the upstream spillway channel at Oahe Dam beginning at centerline of the the Spillway Gate Control Structure (station 26+00) and extending approximately 1700 feet upstream (station 9+00) to the reservoir as shown on the drawings. All soil materials dredged from the upstream channel shall be deposited in the dredge waste material area as shown on the drawings. The work associated with the upstream spillway channel shall also consist of re-sloping/re-grading the side slopes of the channel, construction of a breakwater and the placement of rock (riprap) slope protection as shown on the drawings. The work in the dredge waste material area shall include the construction of two earthen embankments (upper and lower) and each with its own drainage structure and riprapped-lined outlet channel. All fill necessary for the construction of the embankments, stability berms and berm fingers shall come from the lower and upper pool excavation areas as shown on the drawings. All excavated material in excess of what is required to construct the embankments, stability berms and berm fingers, shall be deposited the the areas designated for excess excavation material as shown on the drawings and in accordance with the scope of work.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA64/W912HY-12-B-0012/listing.html)
 
Record
SN02858168-W 20120830/120828235859-d127fe2e2e8b45e65e4b4d9b3cbdf559 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.