AWARD
Y -- Design and Construction of the 13th CAB Control Tower at Fort Carson, Colorado
- Notice Date
- 8/3/2012
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
- ZIP Code
- 68102-4901
- Solicitation Number
- W9128F12R0012
- Response Due
- 4/10/2012
- Archive Date
- 9/2/2012
- Point of Contact
- Donna Larson, 402-995-2066
- E-Mail Address
-
USACE District, Omaha
(donna.r.larson@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W9128F-12-C-0048
- Award Date
- 8/2/2012
- Awardee
- Hensel Phelps Construction Company<br>420 Sixth Avenue<br>Greeley, CO 80632
- Award Amount
- $10,891,000.00
- Line Number
- 0001, 0002 and 0003
- Description
- Design-build a consolidated Airfield Operations Building (AFOB) and Air Traffic Control (ATC) Tower. The Airfield Operations Building is the central command, control, services, and management center of an Army Aviation Complex. The Air Traffic Control (ATC) Tower component of the facility is the primary FAA or International airspace interface, controlling all ground and air movement on an Army Aviation Complex. The AFOB and storage structures shall have an approximate allowable gross area of 14,300 square feet. The ATC Tower gross area consists of approximately 8,300 square feet. The combination of the AFOB and ATC results with an AFOB/ATC Facility of approximately 22,600 gross square feet. Construction to include all required utilities, equipment, and site development (pavement for delivery trucks and car parking, walks, curbs, gutters, storm drainage, landscaping and other site improvements). The estimated construction cost of this project is between $10,000,000 and $15,000,000. _______________________________________________________________________________ The Contractor will be required to commence work within 10 days after notice to proceed and complete the work in the proposed number of calendar days (NTE 540 calendar days) after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Bidders (Offerors): Please be advised of on-line registration requirement in Central Contractor Registration (CCR) database https://www.bpn.gov/ccr/default.aspx and directed solicitation provisions concerning electronic annual On-line Representations and Certifications (ORCA) at https://orca.bpn.gov. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to ORCA.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F12R0012/listing.html)
- Record
- SN02827005-W 20120805/120804000032-a0b284e0491052ecbc8d655653d2ac66 (fbodaily.com)