SOLICITATION NOTICE
Z -- Repair Pavement Bldg 680 - RFP-Solicitation
- Notice Date
- 8/2/2012
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of the Air Force, Air Force Special Operations Command, 27 SOCONS, 110 E. Sextant, Cannon AFB, New Mexico, 88103-5109, United States
- ZIP Code
- 88103-5109
- Solicitation Number
- FA4855-12-R-0011
- Point of Contact
- Roger E. Wygant, Phone: 575-784-2880
- E-Mail Address
-
roger.wygant@cannon.af.mil
(roger.wygant@cannon.af.mil)
- Small Business Set-Aside
- HUBZone
- Description
- SF 1442 Solicitation Wage Determination Design Submittal Standards Concept Drawings Material Submittals Material Submittals References Statement of Objectives The objectives of this Work include but are not limited to: a) Provide drainage report. This report shall include at a minimum: description of the offsite watershed(s) that affect the project, description of existing peak discharges with supporting hydrologic calculations, description of proposed peak discharges with supporting hydrologic calculations, a summary of detention/or retention requirements supported by hydrologic and hydraulic calculations, and a comparison of existing and proposed conditions with the intent of providing drainage solutions. Any hydraulic structures must be supported by this report. See attached Conceptual Drawings. b) Provide Utility Plan. Verify existing utilities within the project and make necessary changes to existing configuration in order to accommodate this development. See attached Conceptual Drawings. c) Provide grading plan. See attached Conceptual Drawings. d) Provide striping and signage plan. See attached Conceptual Drawings. e) Provide Design Analysis. f) Repair and reconstruct paved parking areas, in accordance with the approved design based upon attached Conceptual Drawings. g) Work shall be done in accordance with the attached References. h) In order for building 680 to continue its day to day operations, at the very minimum, one of the delivery entrances (north or south) will have to stay open during the construction period. i) With the potential award of additional projects being constructed within the constraints the period of construction may overlap; therefore, the contractor must provide an optional construction phasing plan.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFSOC/FA4855/FA4855-12-R-0011/listing.html)
- Place of Performance
- Address: 110 E Sextant, Cannon AFB, New Mexico, 88103, United States
- Zip Code: 88103
- Zip Code: 88103
- Record
- SN02824409-W 20120804/120803000007-24cfd7111d578b9fbb1e41e16981d818 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |