AWARD
Z -- Exterior Restoration of Building 452 located at NSA Mid-South, Millington, TN
- Notice Date
- 7/25/2012
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- N40083 NAVFAC MIDWEST PWD MIDSOUTH 5722 INTEGRITY DRIVE Bldg 455 Millington, TN
- ZIP Code
- 00000
- Solicitation Number
- N4008312R5012
- Archive Date
- 7/25/2012
- Point of Contact
- Michael Terrell
- E-Mail Address
-
4-5490
- Small Business Set-Aside
- Partial Small Business
- Award Number
- N4008312C5012
- Award Date
- 7/25/2012
- Awardee
- Toles Construction (DUNS 101812238)<br />
- Award Amount
- $186,404.00
- Line Number
- 0001
- Description
- The purpose of this contract is to provide an Exterior Renovation of Building 452. The contractor shall prove all labor, materials, tools, equipment and qualified supervision for the completion of this project. The project is located at Naval Support Activity, Millington, TN. The period of performance for this project will be 120 calendar days after the date of the award. a. Blast clean cement stucco surfaces using walnut shell, (dry system method) in designated areas as shown on the design drawings. Repair 1" thick cement stucco, all of the blast clean stucco surfaces shall be parged. Cement stucco surfaces not receiving blast cleaning shall be lightly washed prior to repainting, including soffits. Handrails located in each stariwell shall be painted, but, no surface preparations. Balconies at 2nd and 3rd floors, handrails and fascia shall not be disturbed and are not in this contract. b. Pressure wash brick veneer surfaces using a water and chemical solution such as (Stone Technologies, Corp ® Concrete Cleaner #1) or equal. Cleaning solution shall be mixed for heavy duty cleaning at 5:1 dilution. Prior to pressure washing brick veneer, protect all doors and windows, Landscaping shrubs and plants around the building and adjacent to from damage due to chemically treated water, drifting mist and run-off. Minor pointing of masonry joints may be required after pressure washing. c. Prepare surfaces on metal window frames. Apply primer coat, intermediate coat and finish coat. Paint shall be Sherwin-Williams ® exterior gloss alkyd based paint or equal. d. Prepare surfaces and paint exterior side of doors and jambs. Apply primer coat, intermediate coat and finish coat. Paint shall be Sherwin-Williams ® exterior gloss alkyd based paint. e. Provide new metal door signs (tags) on all 2nd and 3rd level exterior doors. New signs (tags) shall be similar to the existing 1st level door signs. f. Remove and install new vertical and horizontal metal control and expansion joints at areas indicated on design drawings. g. Apply High Performance coating to all cement stucco surfaces and above grade foundation walls using the following products; Hy-Tech ® Chalk Locker, Insul Flex elastomeric, ceramic filled coating.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N40083A/Awards/N4008312C5012.html)
- Record
- SN02814691-W 20120727/120725235650-4ba637f2adacbc0d4bd2c6f3ad71109f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |