Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 14, 2012 FBO #3885
SOLICITATION NOTICE

54 -- Manufacture and deliver one New 1,200 U.S. Gallon minimum Mobile GASOLINE Fuel Tank, with option to manufacture one additional fuel tank with identical specifications.

Notice Date
7/12/2012
 
Notice Type
Presolicitation
 
NAICS
332420 — Metal Tank (Heavy Gauge) Manufacturing
 
Contracting Office
USACE District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
 
ZIP Code
61204-2004
 
Solicitation Number
W912EK-12-T-0064
 
Response Due
7/23/2012
 
Archive Date
9/21/2012
 
Point of Contact
Sue Robinson, 309-794-5442
 
E-Mail Address
USACE District, Rock Island
(diana.s.robinson@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Salient characteristics - Tank: Double-walled, dual baffled, DOT fuel tank for holding, transferring or transporting fuel - GASOLINE only. Minimum fuel capacity shall be 1,200 US gallons, not to exceed 1300 gallons. Minimum five year warranty on inner/outer tank integrity. The design of the fuel tank shall be such that the fuel tank mounts inside the outer tank. The outer tank shall be large enough to hold all the fuel should the inner fuel tank break, crank or leak (110 percent capacity in the interstice). The inner-tank shall have: 3 inch (min) top fill lockable filler cap, with 2 gallon (min) spill containment. 100 percent of the inside of the inner tank shall be lined with Amercoat 90HS White Resin and Cure Epoxy-phenolic tank lining or equivalent. Dual - full walled baffles to prevent fuel from knocking out the head walls. 10-guage carbon steel (min. thickness) construction with NO skip welds. Tanks shall be pressure tested. Fuel tank level gauge. Fuel pump ON/OFF controls. Triple venting system (Trident Combination Vent: inflow, outflow, and emergency venting, with overturn) for safe storage and transfer of gasoline. The pressure activated emergency vent shall be factory flow tested and marked in accordance with D.O.T. and N.F.P.A. One (1) Fusible plug (103,000 CFH) flow tested and marked in accordance with D.O.T. and N.F.P.A. 385. Fusible Plug must be installed with lettering facing the outside of tank and made visible and accessible through a view hole in the outer tank. 4-digit fuel flow meter w/ totalizer - digital 1 inch. UL explosion proof electric fuel pump w/ power cord - 115 v / 30 gallons per minute (min.), and E/valve assembly with hose, pump mount assembly, and bottom roller for hose control. Hose reel kit with auto-rewind - 1 inch by 75 feet (min. length) UL fuel hose with static wire and spring retractable hose reel. 1 inch automatic fueling nozzle, high flow, and nozzle holder. Fuel tank painted white (two urethane primer coats, three polyurethane paint coats). Fuel appropriate signage and placards (gasoline). Outer Tank/Frame: The outer tank to base and/or frame of the fuel tank shall be constructed in a manner to ensure fork lifting, loading, transporting, offloading, and relocation do not negatively affect the structural integrity of the tank or refueling equipment. Require tie-down or mounting clips at all four corners of the frame to allow mounting on a barge deck. Frame shall be sufficient to contain fueling/refueling equipment (i.e. hose reel, fuel pump, etc.). Frame shall have full load lifting eyes/lugs. Static grounding wire system. Shipping to the Mississippi River Project - Service Base at 25549 189nd St., Pleasant Valley, IA 52767 shall be included in vendors estimate total. Date of delivery: The Contractor shall deliver within 45 calendar days after Contract Award a minimum of one fully manufactured and assembled gasoline fuel tank as specified and identified in the Base Bid Scope of Work and the bidding schedule. The Contractor shall be given an additional 45 calendar days to deliver OPTION-A for the second gasoline fuel tank, should the Government choose to exercise the option. The Government reserves the right to exercise OPTION-A by no later than 30 October 2012. SEE SOLICITATION
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/W912EK-12-T-0064/listing.html)
 
Place of Performance
Address: Mississippi River Project Maintenance Unit 25549 182nd st Pleasant Valley IA
Zip Code: 52767-0534
 
Record
SN02801896-W 20120714/120713000419-031aed085a22b4b01f1eb7936646a15c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers