Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 29, 2012 FBO #3870
SOURCES SOUGHT

C -- Travis Air Force Base Performance Based Remediation (PBR) - SOURCES SOUGHT

Notice Date
6/27/2012
 
Notice Type
Sources Sought
 
NAICS
562910 — Remediation Services
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, ESG - Enterprise Sourcing Group, Building 1, 1940 Allbrook Dr, Wright Patterson AFB, Ohio, 45433-5006, United States
 
ZIP Code
45433-5006
 
Solicitation Number
FA8903-12-R-0043
 
Archive Date
7/28/2012
 
Point of Contact
Joe Arriaga, Phone: 2103958742, Phillip Waters, Phone: 210 395-8749
 
E-Mail Address
joe.arriaga@us.af.mil, phillip.waters@us.af.mil
(joe.arriaga@us.af.mil, phillip.waters@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Travis Potential Bonding Stream Power Point DRAFT SOO Enclosure 5 'Acronyms and Definitions DRAFT SOO Enclosure 2 'Key Documents List' DRAFT SOO Enclosure 1 'Site List' DRAFT Statement Of Objectives (SOO) THIS IS A SOURCES SOUGHT FOR PLANNING PURPOSES ONLY. THIS REQUEST IS NOT A SOLICITATION. PLEASE DO NOT SUBMIT A PROPOSAL. The 772 ESS/PKB is considering a performance-based approach for Site Closeout (SC) involving remedial action efforts at Travis Air Force Base in California. Performance-Based Remediation (PBR) emphasizes results in terms of environmental clean-up for an entire installation (fence-to-fence), or group of installations, in lieu of a study-based approach. Travis. Air Force Base currently covers approximately 6,368 acres, and is bordered by the cities of Vacaville to the north, Fairfield to the northwest, and Suisun City to the west, and by agricultural land to the south and east. Remediation activities at Travis AFB are being conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA), Resource Conservation and Recovery Act (RCRA), and the California State Water Resources Control Board. Regulatory oversight is provided by the California Department of Toxic Substances Control (DTSC), successor to the California Health Services; the United States Environmental Protection Agency (USEPA) Region 9, acting as the lead regulatory agency; and the Regional Water Quality Control Board (RWQCB), Santa Ana Region. The PBR approach looks for technically and cost-effective methods for achieving this clean-up by focusing on achievement of desired objectives without specifying the processes or technologies for obtaining those objectives. The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of SCs or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost effective manner. It is desirable to the Government that Life-Cycle Costs (LCC) be reduced. If SC with no new institutional controls is not obtainable within the POP of this effort, the Contractor shall outline the Optimization Exit Strategy (OES) that will be implemented to accomplish SC. Bonding Capacity: The Air Force is currently proposing to require performance and payment bonds for only the construction portion of this PBR. The total estimated construction cost rough order of magnitude is anticipated to be between $20M - $25M. Site Visit: The Air Force is anticipating a site visit to occur at Travis Air Force Base in California around Sep/Oct 2012. Be advised that this is a tentative schedule and is subject to change. Site visit attendance is voluntary and is not mandatory that you attend. Please note that all site visits will be at the Contractor's expense and costs associated with site visits will not be reimbursed by the Government. Security Forces will require a firm list of contractor attendees prior to the site visit and no substitutions will be allowed. Attendance will be limited to the number of individuals per prime contractor. Specific details regarding the site visit will be provided once the dates have been confirmed. The POP is estimated at 120 months from date of award. The estimated Rough Order of Magnitude (ROM) anticipated for any resultant contract is between $40,000,000 and $50,000,000. Additional information is also provided. The following documents are included as uploaded attachments to this notice: DRAFT Statement of Objectives (SOO), dated 05 June 2012; DRAFT SOO Enclosure 1, Site List, dated 05 June 2012; DRAFT SOO Enclosure 2, Key Documents List, dated 11 May 2012; DRAFT SOO Enclosure 5, Acronyms and Definitions, dated 05 June 2012, and Travis Potential Bonding Stream, dated 25 June 12.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/a572e49d24f17cfdaa5bb4bc18ce0e8c)
 
Place of Performance
Address: Travis Air Force Base, CA, California, United States
 
Record
SN02787349-W 20120629/120627235009-a572e49d24f17cfdaa5bb4bc18ce0e8c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.