Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 28, 2012 FBO #3869
SOLICITATION NOTICE

Y -- Trail Re-routes on Jake and Bull Mountain Trail System, Chattahoochee-Oconee National Forest, including layout, planning, surveying, permits, and construction

Notice Date
6/26/2012
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-8 Chattahoochee and Oconee National Forests, 1755 Cleveland Highway, Gainesville, Georgia, 30501
 
ZIP Code
30501
 
Solicitation Number
AG-435H-S-12-0032
 
Point of Contact
Marcia O'Connor, Phone: 770-297-3055, Kimberly B. Carithers, Phone: 770-297-2947
 
E-Mail Address
moconnor@fs.fed.us, kcarithers@fs.fed.us
(moconnor@fs.fed.us, kcarithers@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
PROJECT DESCRIPTION: The Jake and Bull Mountain Trail System provides recreational trails for equestrians, bicyclists and hikers. This improvement project is to construct specific trail re-routes to achieve a series of interconnected loop trails of varying lengths and difficulty levels. Contractor will provide layout, planning and surveying, obtain required permits, and will construct approximately 5 miles of non-motorized multi-use trails that are low maintenance, sustainable, and that meet the needs of the user at a reasonable price. In addition, the contractor shall close approximately 3.5 miles of poorly located, undesignated, existing trails in areas that are not incorporated into the new trail network proposal. The trail centerline has been mapped and flagged on the ground. The contractor will use this centerline to layout and construct the new routes within a 25 foot corridor with trail maintenance equipment. Trails within the Jake and Bull Trails Project are to be managed as "Class 3 Pack and Saddle" as found in the Forest Service Trails Management Handbook. There are specific design and construction criteria required to meet this management goal. The contractor will be required to produce a site plan based upon a survey of the proposed layout. PROJECT LOCATION: The work is to be performed at the Jake and Bull Trail System. To locate project site from Dahlonega, GA take GA-52/GA-9 towards Nimblewill for 3.6 miles. Turn right onto GA-52 and go for 4.6 miles. Turn right onto Nimblewill Church Road and go for 1.7 miles. Turn Left on FDR 83. This will take you to the Bull Mountain Parking area. ESTIMATE COST RANGE: less than $150,000 SOLICITATION DOCUMENTS, SPECIFICATIONS, AND DRAWINGS: The solicitation, AG-435H-S-12-0032 and related documents will be issued via FedBizOpps and will be available for downloading on or about July 11, 2012 at the website address: http://www.fedbizopps.gov/
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/435H/AG-435H-S-12-0032/listing.html)
 
Place of Performance
Address: Lumpkin County, Georgia, United States
 
Record
SN02786578-W 20120628/120626235316-a24d874720ec07896712a907a0b6e39c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.