Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 23, 2012 FBO #3864
SOLICITATION NOTICE

F -- Navajo Basin East Stewardship

Notice Date
6/21/2012
 
Notice Type
Presolicitation
 
NAICS
113310 — Logging
 
Contracting Office
Department of Agriculture, Forest Service, R-4 Utah Acquisition Support Center, 2222 West 2300 South, Salt Lake City, Utah, 84119, United States
 
ZIP Code
84119
 
Solicitation Number
AG-84N8-S-12-0060
 
Archive Date
9/30/2012
 
Point of Contact
Charlotte Vanderbilt, Phone: 8019753471
 
E-Mail Address
cvanderbilt@fs.fed.us
(cvanderbilt@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
This proposed procurement is unrestricted pursuant to Stewardship Authority. This solicitation and any resultant contract is a stewardship project and is subject to the Availability of Funds Clause (FAR ). The objectives of the Navajo Lakes East Stewardship Project area are summarized as follows: The Navajo Basin East Stewardship Project is located on the Cedar City Ranger District of the Dixie National Forest encompassing the area indicated on the Project Area Map (which includes Contract Area Maps) Restoration objectives for the project area are summarized as follows: •Improve Forest Health - Provide growing space for healthy trees and reduce fuel loadings •Aspen Regeneration and Aspen Improvement. •Improve soil and aquatic conditions - Provide for soil and riparian function and productivity. Provide timely soil erosion control measures and restorative work. •Utilize Timber or other products - Provide wood resource to forest product industry. To accomplish these objectives, the contract includes the following components: stand cleaning/thinning, mechanical fuels reduction, non-commercial cleaning/thinning, and piling of fuels, timber or other products removal. Project Location - Project is located in Township 38 South, Range 8 West, Sections 4, 5, 9, 10, 11, 12, approximately 22 miles southeast of Cedar City, south of UT-14 in the general vicinity of Navajo Lake. A Site Visit is scheduled to be held July 16, 2012 at 10 a.m. (local Cedar City time). Parties to are to meet at the Dixie National Forest Supervisor's Office, located at 1789 North Wedgewood Lane, Cedar City, UT 84721 and from there proceed to the site. The magnitude of the construction portion is estimated to be between $25,000 and $100,000. The Solicitation will be posted on or about July 5, 2012. All questions regarding the solicitation, both during pre-solicitation period and after the posting of the solicitation must be in writing Contracting Officer, Charlotte Vanderbilt (cvanderbilt@fs.fed.us) and reference the solicitation number and title "Navajo Basin East Stewardship". The Contracting Officer will route the question to the appropriate subject matter expert for clarification or answer. If the answer to a question comes from a source other than the solicitation itself, and if the clarification or answer is something which needs to be know by all offerors, then the Contracting Officer will collect the answers for publication in a solicitation amendment.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/84N8/AG-84N8-S-12-0060/listing.html)
 
Place of Performance
Address: Project Location – Project is located in Township 38 South, Range 8 West, Sections 4, 5, 9, 10, 11, 12, approximately 22 miles southeast of Cedar City, south of UT-14 in the general vicinity of Navajo Lake., Cedar City, Utah, United States
 
Record
SN02782011-W 20120623/120621234907-308dcbb20dfe466f556695182fda5a68 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.