SOLICITATION NOTICE
J -- 38 Meter Aerostat Reconsistution, Reintegration & Proof of Concept Deployment
- Notice Date
- 6/20/2012
- Notice Type
- Presolicitation
- NAICS
- 334511
— Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- Contracting Office
- Department of the Air Force, Air Combat Command, AMIC CONTRACTING OFFICE, 11817 CANON BLVD, Suite 306, Newport News, Virginia, 23606-4516, United States
- ZIP Code
- 23606-4516
- Solicitation Number
- 20JUN2012
- Archive Date
- 7/26/2012
- Point of Contact
- Ryan S. Wilson, Phone: 7572252311, Rhonda R. Foster, Phone: (757) 764-4961
- E-Mail Address
-
ryan.wilson@langley.af.mil, rhonda.foster@langley.af.mil
(ryan.wilson@langley.af.mil, rhonda.foster@langley.af.mil)
- Small Business Set-Aside
- N/A
- Description
- This is a synopsis for commercial services prepared in accordance with the format in FAR subpart 5.207, and supplemented by additional information included in this notice. 1. Action Code: 20JUN12 2. Date: 20 June 3. Year: 2012 4. Contracting Office Zip Code: 23606 5. Classification Code: M 6. Contracting Office Address: ACC AMIC/PKA 11817 Canon Blvd, Ste 306 Newport News, VA 23606 7. Subject: 38 Meter Aerostat Reconstitution & Radar Reintegration 8. Proposed Solicitation Number: TBD 9. Closing Response Date: 11 July, 2:00 PM Eastern Standard Time 10. Point of Contact: Ryan Wilson, ryan.wilson@langley.af.mil, or: Rhonda Foster, rhonda.foster@langley.af.mil Questions: Ryan Wilson at (757) - 225 - 2311 11. Contract Award & Solicitation Number: TBD 12: Contract Award Dollar Amount: N/A 13: Contract Line Item Number(s): 0001 Payload Integration & Testing 0002 Update Aerostat Tech Manuals w/ Radar Installation & Removal Procedures 0003 Deflation 0004: Parts, Material & Services (Pre-Deployment & Deployment) 0005: Storage 0006: Deployment Manpower 0007: Travel Deploymeny/Site Survey 14. Contract Award Date: N/A 15. Contractor: N/A 16. Description: The contractor support needed is: 1) integration of modified Sentinel Radar onto the government-owned 38M Aerostat; 2) update of the non-proprietary aerostat system manuals to include the modified sentinel radar installation, integration, and removal procedures and flight parameters; 3) parts, materials and services required to maintain/sustain the aerostat during the radar integration and manual update effort; 4) aerostat deflation and storage services; 5) Proof of Concept deployment for 30~45 days. 17. Place of Contract Performance: N/A 18: Set-Aside Status: N/A
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/AACCONS/20JUN2012/listing.html)
- Record
- SN02780989-W 20120622/120620235631-4d161e90ff11c6567dd5d4df259f86c4 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |