56 -- NOAA/NSOF Mechanical/Electrical Upgrade

Notice Date
6/7/2012
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Triangle Service Center (WPZ), 7th & D Streets, SW, Room 7660, Washington, District of Columbia, 20407
 
ZIP Code
20407
 
Solicitation Number
GS-11P-12-ZG-C-0103
 
Point of Contact
Farrin Stanton, Phone: 2027551005, Saundra D. Sloan, Phone: (202)755-1035
 
E-Mail Address
farrin.stanton@gsa.gov, saundra.sloan@gsa.gov
(farrin.stanton@gsa.gov, saundra.sloan@gsa.gov)
 
Small Business Set-Aside
Competitive 8(a)
 
Description
The NOAA Satellite Operations Facility (NSOF) in Suitland, MD, is in need of an upgrade of IT Computing Power. NOAA has new satellite operations implemented every few years. The latest Geostationary Operational Environmental Satellite (GOES) system is the "R-Series", known as GOES-R. This project is being implemented to house the Remote Back Up (RBU) facility of GOESR Core GS System at the NOAA/NSOF building located in Suitland, MD. Triangle Service Center of GSA has been tasked to undertake a fast track project to increase the critical UPS capacity at the NSOF facility. To facilitate the integration of the GOES-R into the NSOF facility, the existing mechanical, electrical, and data center IT infrastructure and layout needs major re-configuration. This construction portion has been divided into 4 work elements (WE) as follows: WE-2 Generator Upgrades WE-3 UPS System Upgrades WE-4 Chiller Plant Upgrades WE-5 Computer Room Upgrades There are two phases of IT power increase. Schedule shall allow for 339 calendar days completion of IT power increase for Phase I from award of contract. Phase II power increase shall allow for an additional 68 calendar days from the completion of Phase I power increase. An additional 184 calendar days should be added for completion of Phase II. The total duration of contract is 591 calendar days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/WPZ/GS-11P-12-ZG-C-0103/listing.html)
 
Place of Performance
Address: NOAA/NSOF, 4231 Suitland Road, Suitland, MD 20746, Suitland, Maryland, 20910, United States
Zip Code: 20910
 
Record
SN02769771-W 20120609/120608000252-a4746e3ce29574d850d52866477bb908 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.