Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 03, 2012 FBO #3844
SOLICITATION NOTICE

Y -- OLD SAUK TRAIL LOOP CONSTRUCTION DARRINGTON RANGER DISTRICT

Notice Date
6/1/2012
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-12-0037
 
Point of Contact
Jorge A. Somoza, Phone: (425) 783-6053
 
E-Mail Address
jsomoza@fs.fed.us
(jsomoza@fs.fed.us)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
This project involves the construction and conversion of the Old Sauk Trail #728. The Base Bid Item includes clearing, grubbing, excavation, turnpike construction, puncheon bridge construction, installation of retainers, installation of drainage structures, and surfacing of the entire trail and viewpoints. Option Item #1 includes the construction of 941 LF of Turnpike with limestone surfacing. All of Option Item #1 is on an old roadbed and is cleared and grubbed. Blasting is not expected, but may be used if needed. The use of helicopters or stock is not expected. Work is expected to start on this project as soon as possible and will be complete by November 1, 2012. This is part of a larger trailhead construction and interpretation project. The first part of this trail was mostly built by the trailhead contractor and USFS Crews. Work items included in this contract will complete this job. The first 4700 feet were constructed in 2011. Most of this will need surfacing and the installation of some features. The remaining 1433 LF will be new construction, following an existing 24" wide trail tread. See the Construction Log for details. This project is located on the Darrington Ranger District, of the Mt. Baker-Snoqualmie National Forest. All relocation is located outside of designated wilderness. Take I-5 north of Seattle to state highway 530 and Arlington exit. Stay on Highway 530 to the town of Darrington. In Darrington, highway 530 turns left to Rockport and the North Cascades Highway. At this intersection turn right, follow FSR 20 approximately 5 miles to the new trailhead. The new parking is on the left. The trail takes off at the back of the new parking lot. The construction log follows the trail clockwise from the beginning of the loop. The Government's estimated price is between $100,000 and $250.000. This project is 100% set aside for Service Disabled Veteran Owned Small Business. Bonding is required. The solicitation will be posted around June 15h 2012. Technical contact for this project is Bridget Wisniewski at (360) 436-2339 or e-mail bwisniewski@fs.fed.us
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-12-0037/listing.html)
 
Place of Performance
Address: 1405 Emens Avenue N, Darrington, Washington, 98241, United States
Zip Code: 98241
 
Record
SN02763500-W 20120603/120601235103-6b61537e17e9c33803ee1b7f12e93e5c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.