SOURCES SOUGHT
A -- baffle chiller
- Notice Date
- 5/22/2012
- Notice Type
- Sources Sought
- NAICS
- 333415
— Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- Contracting Office
- Department of Energy, SLAC National Accelerator Lab, SLAC National Accelerator Lab, 2575 Sand Hill Road, Menlo Park, California, 94303, United States
- ZIP Code
- 94303
- Solicitation Number
- slac177022
- Archive Date
- 5/25/2012
- Point of Contact
- Barbara A. Kosic, Phone: 6509263975
- E-Mail Address
-
bkosic@slac.stanford.edu
(bkosic@slac.stanford.edu)
- Small Business Set-Aside
- N/A
- Description
- Brand Name or Equal GC Industries - Model 60WCLT-SLA with regular 3 hp Stainless steel pump Icewagon Qty 1 Description Additional requirements: 1) All components in contact with the coolant shall be compatible with Triethyl Phosphate (see MSDS). THE NEW MACHINE WILL BE AS MODEL SERIAL# WCLT609910209. ALL COMPONENTS USED SUCH AS PIPNG AND EVAPORATOR AND PUMP WILL BE COMPATIBEL WITH WHAT WAS PROVIDED BEFORE. THE OLD MACHINE'S WERE NOT SPECIFICALLY DESIGNED FOR TRIETHYL PHOSPHATE. 2) Unit dimensions: 50-1/2" long X 30-1/2" wide X 54-1/2" high. YES 3) Process and Condenser water piping shall be located at opposite end of control enclosure. YES 4) Unit shall be bolt-down installation (no wheels). YES 5) Compressor shall be semi-hermetic with oil level sight glass and crankcase heater. WILL BE NEWER MODEL OF SEMI HERMETIC COMPRESSORIF THE ORIGINAL HAS BEEN DISCOUNTINUED BY THE MANUFACTURER 6) Helical oil separator with oil return. OIL SEPERATOR WILL BE INCLUDE. A NEW FLOW AND ELCTRICAL DIAGRAM WILL BE PROVIDED AFTER THE ORDER IS RECEIVED. YOU WILL HAVE AN OPPURTUNITY TO REVIEW AND SIGN OFF BEFORE PRODUCTION AND ORDERING OF MATERIALS BEGIN 7) Coolant level sight glass. YES 8) Optimum operating range of +10 to -30 DegF. OPERATING TEMPERATURE WILL BE SET FOR -22 Deg F. you can change the temperature within the operating range of the compressor. We will provide you with the range, however all other components ie evaporators and condensors will be rated for -22 deg f 9) Stainless steel evaporator and fully insulated stainless steel coolant reservoir. YES 10) Stainless steel fill tube and cap. 10" SS FILL TUBE WILL BE PROVIDED INSTEAD OF PVC.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/SLAC/STAN/slac177022/listing.html)
- Place of Performance
- Address: 2575 Sand Hill Rd., Menlo Park, California, 94025, United States
- Zip Code: 94025
- Zip Code: 94025
- Record
- SN02754421-W 20120524/120522235230-b32ebe93a0e467620f2a71cacf77e001 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |