Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 17, 2012 FBO #3827
SOLICITATION NOTICE

Z -- Replacement of Water Distribution Line near Galley at NAS II Sigonella, Sicily, Italy

Notice Date
5/15/2012
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
N33191 NAVFAC EURSWA FEAD SIGONELLA PSC 812 BOX 3000 FPO AE CATANIA,
 
ZIP Code
00000
 
Solicitation Number
N3319112T0014
 
Point of Contact
Mark A. Gelsinger 095-86-6276
 
Small Business Set-Aside
N/A
 
Description
This is not a request for either a quote or proposal, or an invitation for bid. The intent of this pre-solicitation synopsis is to identify potential offerors for the Replacement of Water Distribution Line near Galley at NAS II Sigonella, Sicily, Italy by means of by means of a firm-fixed-price construction contract. All contractors proposing on Department of Defense solicitations must be registered in the Central Contractor Registration (CCR) prior to award of the contract. The requirements will be procured utilizing Federal Acquisition Regulation (FAR) Part 13 Simplified Acquisition Procedures. The North American Industry Classification System (NAICS) code is 237110. The estimated price range is 18,727 “74,900 Euros. The anticipated requirement includes, but is not limited to, all labor, material, and equipment to replace approximately 150 meters of 200mm iron pipe and associated fittings from Gate Valve MH-1 to Gate Valve MH-2. New water line shall be type PN16 200mm High Density polyethylene (HDPE). All joints shall be mechanical or heat fused. Replace fire hydrant #46 and isolation valve. Fire hydrant shall have American standard hose fittings. New pipe shall be laid on a 20cm sand bed and it shall have minimum of 20cm of sand cover prior to fill. Thrust blocks shall be provided at all changes in direction greater that 30 degrees and at the fire hydrant base. Old line shall be removed and disposed and new line may be installed in the same trench. The new water line shall be pressure tested with final approval of Construction manager (CM). New distribution piping shall be disinfected to prevent bacterial contamination and flushed prior to putting into service. All work shall be performed in accordance with the most current version of the Army Corps of Engineers Safety Manual, EM-385-1-1, and in accordance with all applicable Italian safety laws and norms. The anticipated period of performance is 60 calendar days from the date of contract award. Offerors can download a copy of when it becomes available on the EURONECO website. The solicitation is expected to be issued on our about 31 May 2012. Quotes are expected to be due 30 days after issuance of the solicitation. All dates are tentative and are subject to change. A pre-quote conference and site visit will be indicated on the solicitation documents. All technical and contractual questions regarding this pre-solicitation notice must be submitted in writing to the Contract Specialist at: mark.gelsinger@eu.navy.mil.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N33191SIG/N3319112T0014/listing.html)
 
Record
SN02748870-W 20120517/120516000451-ec5382e6b7f96a345ac72312e9e99387 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.