Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 12, 2012 FBO #3822
SOLICITATION NOTICE

Z -- Dark Canyon Culvert Replacement

Notice Date
5/10/2012
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Blue Mountain Area, Wallowa-Whitman NF, 1550 Dewey Avenue, Baker City, Oregon, 97814
 
ZIP Code
97814
 
Solicitation Number
AG-04M3-S-12-0015
 
Point of Contact
Andrea J. Stanbro, Phone: 541-523-1342, Lorrie Hill, Phone: 541-523-1233
 
E-Mail Address
astanbro@fs.fed.us, ldhill@fs.fed.us
(astanbro@fs.fed.us, ldhill@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT 5/24/2012 WITH RESPONSES DUE ON 6/25/2012. Work Description: The Dark Canyon Creek Culvert Replacement project is an aquatic restoration project that restores vital fish habitat and connectivity in the Upper Grande Ronde River Basin. The existing culvert is an approximately 60' long, 5' diameter pipe. Forest road 21 is a high use recreational road. It is a one lane aggregate surface road and shall be closed during the project. Significant and highly visible traffic control signs shall be required at major intersections/access points in the project area. A detour route shall be utilized along FSRs 2100400, 2135400 and 2135000 and shall be required to be signed and maintained. The new structure shall be a 14 foot structural plate culvert founded on concrete spread footings. The project includes a stream by-pass during construction, about 100 feet of stream reconstruction and simulation, and re-contouring of existing fill slopes. Project is subject to ODFW in-water work window. In-water work can start no earlier than July 1 and must be completed by October 1. Work outside the ordinary high water mark may be performed outside of this time frame. The project is located at approximately MP 10.6 along Forest Road 21 (Spring Creek Road) south of I-84 (T2S, R35E, SE ¼ of Section 26) in Union County, OR. The project is easily accessed from I-84 using Spring Creek exit #248 11 miles west of La Grande. The project is located at approximately MP 10.6. The Government's estimate is between $100,000 and $150,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/04M3/AG-04M3-S-12-0015/listing.html)
 
Place of Performance
Address: Wallowa Whitman National Forest, La Grande, Oregon, 97850, United States
Zip Code: 97850
 
Record
SN02744242-W 20120512/120510234834-bef28817a5e94ee7425f4c280c73656f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.