Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 25, 2012 FBO #3805
SOLICITATION NOTICE

F -- MOUNTAIN PINE BEETLE DEAD TREE REMOVAL

Notice Date
4/23/2012
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
Department of Agriculture, Forest Service, R-4 IDAWY Acquisition Service Center, 1405 Hollipark Drive, Idaho Falls, Idaho, 83401
 
ZIP Code
83401
 
Solicitation Number
AG-02NV-S-12-0026
 
Archive Date
6/2/2012
 
Point of Contact
Tonya M. Groth, Phone: 2085575770
 
E-Mail Address
tgroth@fs.fed.us
(tgroth@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
It is the purpose of this purchase order to secure services to hand fall and buck trees marked with blue paint within designated Campground and trailheads. Most, if not all, of these trees have been killed as a result of Mountain Pine Beetle infestation. In addition the contractor shall be required to remove slash from the campground/trailheads and pile in designated locations. These locations will be less that ¼ mile from the campground/trailhead. Bucked material shall be cut to a maximum four foot length and stacked on-site. The Contractor shall furnish all labor, equipment, supervision, transportation, supplies, and incidentals necessary to perform all work required. The project area includes campground/trailheads located on Challis/Yankee Fork and Middle Fork Ranger Districts of the Salmon-Challis National Forest. The locations of the affected campground/trailheads are contained in the attached maps and described below. Access to campground/trailheads is via a combination of paved and improved native surface roads. During dry road conditions, access is possible to all sites with a 2 wheel drive vehicle. Additional information regarding project area and access is available from the Challis/Yankee Fork Ranger District. Contract time is 60 days from the date of issuance of the Notice to Proceed. The estimated start dated for the project is June 25, 2012. The estimated completion date for the project is August 23, 2012. Quotes will be on a "per tree basis" to accommodate maximum use of available funding in the execution of this contract. The following information indicates estimated trees per campground which may be felled and bucked, and for which the slash would be piled under the terms of the contract. This is an estimate only and numbers may vary as a result of recent and ongoing mortality. Depending upon accepted per tree quote rate, and the funding available, it is possible that not all of the following trees will be treated. FY 2012 Mountain Pine Beetle Dead Tree Removal Project RD Administrative Site Approximate Number of Trees M Fork Josephus Lake TH 270 M Fork Rapid River TH 161 M Fork Marsh Creek TH 42 C-Y Fork Mill Creek CG 125 C-Y Fork Morgan Summit TH 142 M Fork Asher/Knapp Creek TH 174 TOTAL 914
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/02S2/AG-02NV-S-12-0026/listing.html)
 
Place of Performance
Address: Challis/Yankee Fork and Middle Fork Ranger Districts, Salmon-Challis National Forest, Challis, Idaho, 83226, United States
Zip Code: 83226
 
Record
SN02728820-W 20120425/120423235210-71f002a7e2b5a085859b2e15177eb507 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.