Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 24, 2012 FBO #3773
AWARD

Y -- Ft. McCoy, WI - Construction of Automated Record Fire (ARF) Range

Notice Date
3/22/2012
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Louisville, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2230
 
ZIP Code
40202-2230
 
Solicitation Number
W912QR-12-R-0020
 
Archive Date
4/21/2012
 
Point of Contact
Bjorn, 502-315-6196
 
E-Mail Address
USACE District, Louisville
(bjorn.t.hale@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912QR-12-C-0017
 
Award Date
3/22/2012
 
Awardee
RANGE AND CIVIL CONSTRUCTION, LLC (792750163) <br> 27840 COUNTY ROUTE 193 STE 2<br> THERESA, NY 13691-3045
 
Award Amount
$3,325,000.00
 
Line Number
0001
 
Description
This project will construct an Automated Record Fire Range, Operations Storage Building, Range Operation Center Tower, Classroom, Covered Bleacher, Covered Mess, Ammo Breakdown Building, and Wet Latrine. The ARF Range will have a total of 112 stationary infantry targets, downrange limit markers, and lane markers. The ARF Range will be used to train and evaluate units during a live fire exercise. Targets vary from 50m to 300m downrange from a stationary firing position. All targets will be fully automated. Contractor to provide electrical infrastructure for targetry and furnishings. Targetry and furniture will be provided by others. Water will be provided by a well on site and sanitary sewage will be disposed of by septic tank and leach field. The proposed ARF Range is to be placed on an existing Modified Record Fire Range. There are currently existing structures at the proposed Range Operations & Control Area location and targets downrange. Ft. McCoy will remove all of these structures and existing targets and existing steel target emplacements. Removal of concrete slabs, pads, footers, foundations, and existing timber foxholes will be the responsibility of the Contractor. All existing target berms and firing positions on the existing range shall be removed. Site demolition will also consist of the removal of vegetation and all trees that fall within the target line of sight, Contractor is to clear vegetation, trees, and tree stumps in areas of grading, aggregate pavement, and buildings. There is low risk that small arms unexploded ordinance will be discovered during construction. If unexploded ordinance are found, removal will be done by others.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-12-R-0020/listing.html)
 
Record
SN02703407-W 20120324/120322235233-3567d26870a7789165f1e75939689b48 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.