Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 26, 2012 FBO #3746
MODIFICATION

Y -- Mt. St. Helens Sediment Retention Structure, Spillway Elevation Project

Notice Date
2/24/2012
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Portland, Contracting Division (CECT-NWP), P.O. Box 2946, Portland, OR 97208-2946
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N-12-R-0010
 
Response Due
5/1/2012
 
Archive Date
6/30/2012
 
Point of Contact
Jeffrey Renner, 503.808.4630
 
E-Mail Address
USACE District, Portland
(jeff.s.renner@usace.army.mil)
 
Small Business Set-Aside
Competitive 8(a)
 
Description
MSH SRS Spillway Raise PURSUANT TO FAR 19.804-2 ELIGIBILITY IS LIMITED TO 8(a) FIRMS IN THE SMALL BUSINESS ADMINISTRATION PORTLAND DISTRICT PORTFOLIO. This contract involves raising the spillway crest elevation of the existing Sediment Retention Structure (SRS). The SRS was constructed in the late 1980s to trap sediment eroding from the debris avalanche on Mt. St. Helens. The work will be located at the SRS on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest. The work includes: 1. Mobilizing and demobilizing from the site. 2. Care and diversion of water (river diversion) in order to construct in the dry. 3. Rock excavation to construct a plunge pool and low flow channel from the new roller-compacted concrete structure to the existing spillway crest. 4. Rock foundation preparation including placement of dental concrete. 5. Construction of a roller-compacted concrete structure upstream of the existing spillway crest, to raise the elevation of the pool behind the SRS. Magnitude of Construction is $1,000,000.00 to $5,000,000.00. Additional information and a formal Request for Proposal (RFP) will be issued April 2012. Should you have any questions in advance of the formal RFP, please do not hesitate to contact the Contract Specialist listed on this announcement.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/W9127N-12-R-0010/listing.html)
 
Place of Performance
Address: Toutle River Sediment Retention Structure Sediment Dam Road Toutle WA
Zip Code: 98649
 
Record
SN02682774-W 20120226/120224235152-04f735aa5ce718f290b3a580372bd840 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.