Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 11, 2012 FBO #3731
MODIFICATION

23 -- 30 Foot Gooseneck Trailer

Notice Date
2/9/2012
 
Notice Type
Modification/Amendment
 
Contracting Office
IMR - YELL - Yellowstone National Park Contracting OfficePO Box 168 Yellowstone National Park WY 82190
 
ZIP Code
82190
 
Solicitation Number
Q1574122549
 
Response Due
2/27/2012
 
Archive Date
2/8/2013
 
Point of Contact
Andrea Hannon Contract Specialist 3073442859 andrea_hannon@nps.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Total Small Business
 
Description
The following are clarification questions and answers. All other information in the original combined synopsis/solicitation remains the same. QUESTION: Is there are required delivery date? ANSWER: Yes - the delivery date required is May 15, 2012 QUESTIONS: I was curious bout some specs of the 30' gooseneck trailer. i was wondering if the 30' length was an overall length which would include the 8' gooseneck, or if it means 30' of box area plus the 8' gooseneck. ANSWER: The trailer we are asking for is a 30 foot overall length. (30 foot complete length. QUESTION: Is the Department interested in additional ceiling height above the requested 7'? ANSWER: The NPS does not want to change the requirement. QUESTION: Is the Department interested in baggage doors in the nose? ANSWER: The NPS does not want to change the requirement. QUESTION: Is the Department interested in increasing the thickness of the exterior skin or using fiberglass in lieu of aluminum? ANSWER: The NPS does not want to change the requirement. QUESTION: Is the Department requiring a spare tire and wheel assembly? ANSWER: No QUESTION: Please describe what is meant by # 15 "48" exterior risers ATP (Aluminum Tread Plate)"? ANSWER: 48 inch exterior aluminum riser in the front area of the trailer as a stone guard QUESTION: Will an awning be required? ANSWER: No QUESTION: Will any non-skid flooring be required? ANSWER: No QUESTION: An inverter is called out in the SOW. Is an inverter or converter required? Inverter transforms 12v to 110v, a converter transforms 110v to 12v for lights and furnace blower? ANSWER: The NPS would like to operate the trailer lights and heater both ways 110 volt shore power and 12 volt trailer power. QUESTION: Can you advise if a steel frame trailer with aluminum exterior panels will be acceptable? ANSWER: The steel frame trailer with an aluminum exterior panels is acceptable.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/Q1574122549/listing.html)
 
Place of Performance
Address: Yellowstone National Park, WY
Zip Code: 821900168
 
Record
SN02672302-W 20120211/120210114620-501e4fa1860ebf7b31c7614775fc25ae (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.