Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 22, 2012 FBO #3711
DOCUMENT

Y -- SD PRA BADL 10(7), Dillon Pass Road - Solicitation 1

Notice Date
1/20/2012
 
Notice Type
Solicitation 1
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-11-B-00019
 
Archive Date
3/31/2012
 
Point of Contact
Aaron L. Sanford, Phone: 7209633090, Jason J Longshore, Phone: 7209633090
 
E-Mail Address
aaron.sanford@dot.gov, jason.longshore@dot.gov
(aaron.sanford@dot.gov, jason.longshore@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Invitation for Bid for SD PRA BADL 10(7), Dillon Pass. Solicitation # DTFH68-11-B-00019 This project will be advertised on a Full and Open basis. PROJECT DETAILS: SD PRA BADL 10(7), Dillon Pass Road This project is located approximately 75 miles Southeast of Rapid City, South Dakota, within the North Unit of Badlands National Park. The proposed project will rehabilitate 3.48 miles of the parks primary paved road, known as the Badlands Loop Road, with an optional schedule to rehabilitate 1.60 miles of Conata Road. Both routes are entirely within Badlands National Park. Work associated with this project consists of a hot asphalt concrete pavement overlay, drainage improvements, deep pavement patching including excavation, placement of geogrid, placement of new aggregate surfacing, and paving, as well as incidental roadway rehabilitation improvements. The Base schedule A begins just South of the Pinnacles Overlook parking area and terminates west of the Conata Basin Overlook. Principal work items for Base Schedule A include: 9,740 SY of deep pavement patching, 1,330 lf of 24" HDPE pipe, 200 lf of 12" HDPE pipe, 17,700 lnft of asphalt curb, 350SY of concrete sidewalk, 7,500 tons of hot asphalt concrete pavement, 69,200 SY of surface treatment (double chip seal), along with associated traffic control, soil erosion control, and other improvements incidental to road rehabilitation types of projects. There is also one optional schedule: Option X - rehabilitate 1.60 miles of Conata Road beginning at its junction with the Badlands Loop Road (within the limits of the schedule A work) and progressing South. Principal work items include 2,980 tons of hot asphalt concrete pavement, 27,300 SY of surface treatment (double chip seal), 930 SY of deep pavement patching, 440 tons of aggregate topsoil course, and other improvements incidental to road rehabilitation types of projects. It is anticipated that this project will be advertised in early October of 2011 with construction beginning April, 2012 and extending through September, 2012. Estimated cost for the base schedule and option is $3.0 to $6.0 million
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-B-00019/listing.html)
 
Document(s)
Solicitation 1
 
File Name: Link to the CFLHD website where plans, plan holders list, reports and questions/answers may be viewed or downloaded (http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm)
Link: http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Badlands National Park, Interior, South Dakota, 57750, United States
Zip Code: 57750
 
Record
SN02658516-W 20120122/120120234811-b4df5f972f5e2c8fba62393607b432b6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.