Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 27, 2011 FBO #3624
SOURCES SOUGHT

Y -- Construct a 200-member Army Reserve Center - Kansas City, KS

Notice Date
10/25/2011
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Louisville, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2230
 
ZIP Code
40202-2230
 
Solicitation Number
W912QR-11-KANSASCITY-USARC
 
Response Due
11/10/2011
 
Archive Date
1/9/2012
 
Point of Contact
Patrick Duggins, 502-315-6187
 
E-Mail Address
USACE District, Louisville
(patrick.j.duggins@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
A MARKET SURVEY IS BEING CONDUCTED TO DETERMINE IF THERE ARE INTERESTED AND QUALIFIED SMALL BUSINESS, HUBZONE SMALL BUSINESS, 8(a) SMALL BUSINESS, OR SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS CONTRACTORS FOR THE FOLLOWING PROPOSED PROJECT: Construct a 200-member Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), and unheated storage building. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, HVAC systems, plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 630 kWr/179 Tons). Project will be located 20 miles west of Kansas City, KS in Johnson County, in the Shawnee Business Park, located in the vicinity of West 43rd Street and Powell Drive. Contract duration is estimated to be 540 days with an estimated cost range between $10M - $25M. The current target ceiling for this contract is closer to $12M. NOTE: This is the estimated construction award amount and does not include real estate, S&A, DDC or contingency. NAICS is 236220. All interested SMALL BUSINESS, HUBZONE SMALL BUSINESS, 8(a) SMALL BUSINESS, OR SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS CONTRACTORS SHOULD NOTIFY THIS OFFICE IN WRITING BY MAIL ON OR BEFORE 10 NOVEMBER 2011 @ 2:00 PM EST. Responses should include: (1) Identification as a small business or verification of the company by the Small Business Administration, as either a certified HUBZONE, certified 8(a) small business or Service Disabled Veteran-Owned Small Business. (2) The level of performance and payment bonding capacity that the company could attain for the proposed project. (3) Past Experience as a prime contractor. Provide descriptions of your firm's past experience on projects with greater than 95% completion or those projects completed within the last 5 years which are similar in size, scope, and dollar value. Projects considered similar in scope to this project include new construction of national guard armories, army reserve centers, armed forces training centers, office complexes, education facilities, vehicle maintenance shops, and warehouses. Projects similar in size will include new construction projects with a single building or multiple buildings with a combined total of 40,000 SF. Construction of pre-engineered buildings does not count against the 40,000 SF. Projects of similar dollar value will be new construction projects with an original contract amount in excess of $10M. With each project experience provided, include current percentage of construction complete and the date when it was or will be completed. For each project submitted, include the original contract amount, modification costs, and size of the project (stories, SF, etc.), and mentor-protege relationships, the portion and percentage of work that was self-performed, whether the project was Design/Build or not, and a description of how the experience relates to the proposed project. SEND RESPONSES TO: US ARMY CORP OF ENGINEERS, LOUISVILLE DISTRICT 600 DR. MARTIN LUTHER KING JR. PLACE, ROOM 821 ATTN: PATRICK DUGGINS LOUISVILLE, KY 40202-2267 or via email to: PATRICK.J.DUGGINS@USACE.ARMY.MIL THIS IS NOT A REQUEST FOR PROPOSAL AND DOES NOT CONSTITUTE ANY COMMITMENT BY THE GOVERNMENT. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-11-KANSASCITY-USARC/listing.html)
 
Place of Performance
Address: USACE District, Louisville 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville KY
Zip Code: 40202-2230
 
Record
SN02612773-W 20111027/111025234551-51f6f14e4b6bacf0122466cfd46f88a7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.