Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 19, 2011 FBO #3616
AWARD

Y -- RECOVERY--Y--PROJECT NUMBER 71653, HOSPITAL REPLACEMENT

Notice Date
10/17/2011
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N62473 NAVFAC SOUTHWEST, CAMP PENDLETON ROICC/CODE ROPCN MARINE CORPS BASE CAMP PENDLETON PO Box 555229/Building 22101 Camp Pendleton, CA
 
ZIP Code
00000
 
Solicitation Number
N6247310C0001
 
Archive Date
1/31/2014
 
Point of Contact
ALFRED J. SIMPSON, 760 468-3155
 
Small Business Set-Aside
N/A
 
Award Number
N6247310C0001P00010
 
Award Date
10/14/2011
 
Awardee
CLARK/MCCARTHY, A JOINT VENTURE (DUNS 808301787)<br />
 
Award Amount
$211,970
 
Line Number
0001
 
Description
RECOVERY-- 71653, REPLACEMENT HOSPITAL, EXECUTION PROJECT P--1653, REPLACEMENT HOSPITAL CAMP PENDLETON PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR CLARK/MCCARTHY A JOINT VENTURE UNDER CONTRACT N62473-10-C-0001. THE RESIDENT OFFICER IN CHARGE OF CONSTRUCTION HOSPITAL REPLACEMENT PROJECT HAS AWARDED A FIRM-FIXED PRICE MODIFICATION TO CLARK/MCCARTHY A JOINT VENTURE TO: PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO FURNISH AN ANIMATED PRESENTATION VIDEO. DELETE WOOD MODEL REQUIRED BY UFGS 01 33 10.05 20, PARAGRAPH 1.9.2 AND 1.9.2.1. PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO PROVIDE AN INFANT PROTECTION SYSTEM FOR ROOMS 3154, 3164, 3171 AND 3180 UNDER THE AUTHORITY OF FAR 52.243-4 CHANGES (JUNE 2007). SYSTEM SHOULD CONTROL DOORS C310, C314, C317 AND C304. SYSTEM ENTRY SHALL BE FROM THE NURSES' STATION 3156. THE CONTRACTOR WILL PROVIDE 50 WRIST BANDS FOR INFANTS AND CHILDREN UP TO 21 YEARS OLD. PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO REMOVE APPROXIMATELY 650 FEET OF EXISTING 25 PAIR 19 GAUGE COMMUNICATION CABLE AT PACIFIC PLAZA AND REPLACING IT WITH A 200 PAIR 22 GAUGE CABLE; IN LIEU OF PROVIDING APPROXIMATELY 2300 FEET OF OVERHEAD LINE ALONG VANDEGRIFT. LASTLY, THE CONTRACTOR'S REQUEST FOR EQUITABLE ADJUSTMENT FOR DOUBLE HANDLING OF SATURATED SOILS IS GRANTED UNDER THE AUTHORITY OF FAR 52.236-2 (APR 1984).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711G/N6247310C0001/listing.html)
 
Record
SN02608256-W 20111019/111017234123-61015e872cf22f88ad72cd9520b4be3b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.