FBO DAILY ISSUE OF SEPTEMBER 01, 2011 FBO #3568
AWARD

Y -- INSTALLATION OF GUARDRAIL POSTS

Notice Date
8/30/2011
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F-11--Q-G025
 
Archive Date
9/29/2011
 
Point of Contact
MONICA DWYER, 402-667-7873
 
E-Mail Address
USACE District, Omaha
(monica.e.dwyer@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9128F-11-M-G025
 
Award Date
8/30/2011
 
Awardee
C.B.M.C. INC. (071546910) <br> 44 S MAIN ST<br> STANTON, TN 38069-4421
 
Award Amount
$21,580.00
 
Line Number
0001
 
Description
INSTALLATION OF GUARDRAIL POSTS AT OUR TRAINING DIKE FOR THE US ARMY CORPS OF ENGINEERS, GAVINS POINT PROJECT, LOCATED NEAR YANKTON, SD. POC BRYAN BRADLEY 402-667-2560 U.S. ARMY CORPS OF ENGINEERS GAVINS POINT PROJECT TRAINING DIKE GUARD POST INSTALLATION 1. SCOPE OF WORK: Contractor will be responsible for the material, equipment and labor required to install new 8 INCH X 6 INCH X 6 FEET treated guard posts 6 FEET oc along the shoulder of the Training Dike road for a distance of 3,350 lf as per these specifications and drawing. 2. SPECIAL CONSTRUCTION: Posts may be driven or augered and backfilled at the option of the contractor. Posts shall be installed at a depth of 3 FEET. 3. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: The Contractor will be required to commence work under this contract at the date of receipt by him of Notice to Proceed, to prosecute said work diligently and to complete the entire work ready for use by September 30th, 2011. The time stated for completion shall include final cleanup of the premises. 4. CONTRACT DRAWINGS AND SPECIFICATIONS: Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work but they shall be performed as if fully and correctly set forth and described in the drawing and specifications. The Contractor shall check all drawings furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. 5. SITE VISIT: Offerors or quoters are urged and expected to inspect the site where the work will be performed a. Contractors interested in inspecting the site of the proposed work should contact Tony Roerig, Gavins Point Project, US Army Corps of Engineers, PO Box 710, Yankton, SD 57078-0710 (402) 667-2564. 6. GOVERNMENT FURNISHED MATERIALS: None 7. PROTECTION OF EXISTING FACILITIES: Contractor shall be responsible for protection of all existing facilities during the construction. Any damage done to the facilities due to the construction shall be repaired at the cost of the contractor. 8. ENVIRONMENTAL PROTECTION: In order to prevent, and to provide for abatement and control of, any environmental pollution arising from the construction activities in the performance of this contract, the Contractor and his sub contractors shall comply with all applicable federal, state and local laws and regulations concerning environmental pollution control and abatement. a. Notification: The Contracting Officer will notify the Contractor in writing of any non compliance with the aforementioned federal, state or local laws or regulations. Such notice, when delivered to the Contractor or his authorized representative at the site of the work, shall be deemed sufficient for the purpose. The Contractor shall, after receipt of such notice, immediately inform the Contracting Officer of proposed corrective action and take such action as may be approved. If the Contractor fails or refuses to comply promptly, the contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. 9. SAFETY REQUIREMENTS: The Contractor shall ensure that safe working practices are utilized and that all equipment meets the requirements of the US Army Corps of Engineers, Safety and Health Requirements Manual, EM 385 1 1, September 2008, before work begins. A copy of the above manual is available at the Gavins Point Dam Project Office, Yankton, South Dakota P.O. Box 710. a. Ground Fault Circuit Interrupters: In addition to the requirements of paragraph 11.C.05 of EM 385 1 1, ground fault circuit interrupters are required for all extension cord systems. b. First Aid and Medical: First aid facilities shall be made available on the job site. Arrangements for emergency medical attention shall be made prior to start of work. All emergency numbers (doctor, hospital, ambulance, fire department) shall be posted, or made available at the work site. 10. TRAFFIC CONTROL: Location of the posts to be installed is along a very busy road and the contractor shall be responsible to traffic control during construction. 11. AVAILABILITY AND USE OF UTILITY SERVICES: Use of public and private utilities will be as found available. 12. WORK AND MATERIALS GUARANTEE: The Contractor will guarantee materials for one year from the date the Government assumes use of the equipment or materials. 13. PAYMENT: Payment for subject work will be for entire work complete in conformance with these specification. Payment will occur within 30 days of acceptance by the Government and receipt of a proper invoice. Invoice shall include contract number.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/Awards/W9128F-11-M-G025.html)
 
Record
SN02555817-W 20110901/110831000315-ebb37b8e6364443b8875f73142805e05 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.