MODIFICATION
Y -- Crestview Virtical Well Drilling - Amendment 1
- Notice Date
- 8/25/2011
- Notice Type
- Modification/Amendment
- NAICS
- 237110
— Water and Sewer Line and Related Structures Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-5, Central CA Acquisitions Service Area, Tahoe N.F., 631 Coyote Street, Nevada City, California, 95959-2250, United States
- ZIP Code
- 95959-2250
- Solicitation Number
- AG-9A63-S-11-0083
- Archive Date
- 12/31/2011
- Point of Contact
- Denise L Storms, Phone: 530-642-5160, Rebecca A Peabody, Phone: 530-478-6124
- E-Mail Address
-
dlstorms@fs.fed.us, rpeabody@fs.fed.us
(dlstorms@fs.fed.us, rpeabody@fs.fed.us)
- Small Business Set-Aside
- N/A
- Description
- Revised Schedule of Items Pre-Bid Meeting Attendance Roster Revised Drawings SF-30 Amendment to Solicitation SOLICITATION IS BEING EXTENDED TO 9/6/2011. PLEASE SEE THE AMENDMENT DATED 8/25/2011CRESTVIEW WELL DRILLING Inyo National Forest 400 Ft. Vertical well/10000 gallon FRP underground water tank/distribution-water supply lines/pump control lines/power cable line. This specification and other specifications define the requirements for vertical well drilling for Crestview Guard Station, Mono Lake Ranger District located on the Inyo National Forest. Work includes drilling, casing, grouting, yield testing, disinfecting, and developing the vertical well. Also includes the installation of 8-5/8 inch conductor casing to a depth of 50 feet thru the overburden (soft pumice) w/ grout seal and 6 inch liner casing to a depth of 400 feet, concrete surface slab, submersible pump with controls and well head fiberglass enclosure, 10,000 gallon underground FRP water tank, pump supply line 2500 LF, distribution line 2600 LF, electrical power line 500 LF, liquid level control system 2500 LF, valves and valve boxes and pioneering a 200 LF road. The Government's estimate is between $100,000 and $250,000. An organized site visit has been scheduled for: August 17, 2011, 10am, participants will meet at: Crestview Guard Station. The project is located on the Mono Lake Ranger District, of the Inyo National Forest. From Bishop travel north on SH 395 approximately 45 miles to Deadman Creek road FS 2S05 turnoff, proceed west on FS road 2S05 1.5 miles to Crestview Guard station. The estimated date for upload of the Solicitation package is August 1, 2011. Estimated start work date is September 19, 2011.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/9A63/AG-9A63-S-11-0083/listing.html)
- Place of Performance
- Address: Mono Lake Ranger District, Lee Vining, California, United States
- Record
- SN02549127-W 20110827/110825235439-6505ef9f4162b83b600871e1d00b2203 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |