Z -- SPRINKLER HEAD REPLACEMENT BLDG219

Notice Date
8/5/2011
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Luke AFB Contracting Squadron, 14100 W. Eagle Street, Luke AFB, Arizona, 85309
 
ZIP Code
85309
 
Solicitation Number
FA4887-11-R-0020
 
Archive Date
8/20/2011
 
Point of Contact
Jeffrey A Kistler, Phone: 623-856-2768
 
E-Mail Address
jeffrey.kistler@luke.af.mil
(jeffrey.kistler@luke.af.mil)
 
Small Business Set-Aside
N/A
 
Award Number
FA4887-11-C-0026
 
Award Date
8/5/2011
 
Awardee
KOO DESIGN/BUILD, 15685 N CAVE CREEK RD STE 104, PHOENIX, Arizona 85032, United States
 
Award Amount
$31,891
 
Description
STATEMENT OF WORK REPLACE SPRINKLER HEADS @ BUILDING 219 1. SCOPE: The work covered by this statement of work consists in furnishing all plant, labor, equipment, appliances and materials and performing all operations in connection with replacing water sprinkler heads at building 219. All work will be in strict accordance with the contract and applicable Fire and Plumbing Codes. 2. REMOVE AND INSTALL NEW: Potential contractors are encouraged to perform a site visit prior to bidding on contract. The contractor will drain fire suppression system prior to performing work and then recharge when complete. Contractor will purchase and install the following materials: • Remove 300 old sprinkler heads and replace with new Standard-response 5 mm bulb heads. • Remove 300 old escutcheons and replace with new and ensure all are secured properly and mounted correctly to the ceiling tile and 1" service drop pipe. The 1" pipe reduces down to ½" at the sprinkler head • Adjust the height to the 1" service drop as needed so that heads and escutcheons can be mounted correctly at the suspended ceiling. • Replace broken ceiling tile as required. 3. TESTS: After the installation is complete and at such time as the Contracting Officer may direct, the contractor shall conduct an operation test for approval to ensure there are no leaks and the heads are installed correctly and within applicable Fire and Plumbing Codes. The test shall be performed in the presence of the base plumber. The contractor shall furnish all instruments and personnel required for the test. 4. SUBMITTALS: The contractor shall provide submittals for any additional work that may need repair. 5. WARRANTY: The contractor shall provide a 1-year warranty on all work and material.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AETC/LukeAFBCS/Awards/FA4887-11-C-0026.html)
 
Record
SN02523308-W 20110807/110805234610-12ab765d143e8a83347fb0db77d7b55d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.