Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 03, 2011 FBO #3539
SOLICITATION NOTICE

Y -- AZ 34-1(3), Swift Trail

Notice Date
8/1/2011
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-11-B-00015
 
Point of Contact
Jeremiah B. Rogers, Phone: 7209633090, Aaron L. Sanford, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
HUBZone
 
Description
PROJECT DETAILS AZ 34-1(3) Swift Trail consists of reconstructing two locations on State Route 366 (SR 366), Swift Trail. SR 366 is located within Coronado National Forest approximately 7 miles southwest of Swift Trail Junction, Arizona. The project consists of spot improvements at two locations, Noon Creek and Wet Canyon, including realignment, concrete box beam bridge construction, concrete retaining walls, and drainage and parking lot improvements. Work at the Noon Creek site includes 500 cuyd of embankment construction, 48 lnft of 20' span x 7' rise concrete arch culvert, 500 tons of roadway aggregate, 300 tons of hot asphalt concrete pavement, and associated traffic control, erosion control, and surveying and staking. Contractor will need to perform design for culvert structure at Noon Creek, including foundation requirements. Work at the Wet Canyon site includes 600 cuyd of embankment construction, 92 feet of reinforced concrete retaining wall, 184 cuyd of structural concrete, 100,000 lbs of reinforcing steel, 155 lnft of drilled shafts, 150 lnft of concrete curb, 450 tons of aggregate base, 300 tons of hot asphalt concrete pavement, and associated traffic control, erosion control, and surveying and staking. There will be road closures planned for bridge girder setting & drilled shaft construction at Wet canyon and the contractor will need to work closely with ADOT on co-ordination. Swift Trail is subject to heavy snow accumulations and ADOT snowplowing operations will need to be accommodated at all times. It is anticipated that this project will be advertised in mid-August, 2011 with construction beginning in mid September and completing in 2012. Estimated range for this project is $1 to $3 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-B-00015/listing.html)
 
Place of Performance
Address: Coronado National Forest, Safford, Arizona, 85546, United States
Zip Code: 85546
 
Record
SN02516775-W 20110803/110801234848-c1c7afbece03c0a58a86db3366d08b15 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.