SOLICITATION NOTICE
Z -- 1817 Tall Timbers Reconstruction
- Notice Date
- 7/28/2011
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-6 Western Oregon ZAP, Willamette NF, 3106 Pierce Parkway, Suite D, Springfield, Oregon, 97477, United States
- ZIP Code
- 97477
- Solicitation Number
- AG-04R4-S-11-0028
- Archive Date
- 7/27/2012
- Point of Contact
- Eric Oldenkamp, Phone: 541-225-6475, Lorenzo R Montoya, Phone: 541-225-6334
- E-Mail Address
-
ejoldenkamp@fs.fed.us, lrmontoya@fs.fed.us
(ejoldenkamp@fs.fed.us, lrmontoya@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- Falling of danger trees includes removing from roadway prism. Roadway Reconditioning of shoulders and ditches. Removal and replacement of 18" and 24" culverts. Repair 2 existing culvert outlets. Delivery of 3 CY of government furnished riprap. Supply and placementof aggregate, government aggregate source available. Log, stump, and tree removal from cut bank and ditches. Road surface repairs by digging out and recompacting. Price Range is between $25,000 and $100,000. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about 8/12/11. Payment protection (100 percent of contract award) will be required after award. Note: prospective awardee shall be registered in the Central Contractor Registration (CCR) data base prior to award. Information on registration may be obtained via the internet at: http://www.ccr.gov or by calling 1-888-227-2423. All contractors and vendors must complete the electronic version of the Representations and Certifications (Section K in Solicitations) in the ORCA system. The ORCA site is http://www.bpn.gov - click on the Online Reps and Certs Application.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/04R4/AG-04R4-S-11-0028/listing.html)
- Place of Performance
- Address: The project can be located as follows: From the town of Lowell Post Office, travel north on Jasper-Lowell Road 3 miles to the Unity Bridge. Turn right on Big Fall Creek road and travel 9.19 miles to the Forest Boundry which then the road becomes USFS road 1800. Proceed a short ways to the junction of USFS road 1817 left the beginning of the project is located at MP 1.97., Oregon, United States
- Record
- SN02513193-W 20110730/110728234749-9250bc11b6d82fea4257f87522cac108 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |