MODIFICATION
A -- HF Geolocation and Characterization (HFGeo) Broad Agency Announcement - Amendment 1
- Notice Date
- 7/25/2011
- Notice Type
- Modification/Amendment
- NAICS
- 541712
— Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- Contracting Office
- Office of the Director of National Intelligence, Intelligence Advanced Research Projects Activity, Washington, District of Columbia, 20511, United States
- ZIP Code
- 20511
- Solicitation Number
- IARPA-BAA-11-07
- Archive Date
- 8/22/2012
- Point of Contact
- Dr. Frank C. Robey,
- E-Mail Address
-
dni-iarpa-baa-11-07@ugov.gov
(dni-iarpa-baa-11-07@ugov.gov)
- Small Business Set-Aside
- N/A
- Description
- IARPA-BAA-11-07 Amendment 01 20110725 in.pdf format IARPA-BAA-11-07 Amendment 01 Description 20110725 in.pdf format This amendment changes and clarifies the original BAA. Amended regions are highlighted in yellow. 1. Pages 5 and 6. Section 1.A.1 (Technical Thrusts) headings are amended to include the Thrust number as an aid for the reader. 2. Page 8. Section 1.A.1 (Technical Thrusts) sentence beginning with "The signal modulation types" is amended to correct where the information is located in the BAA. 3. Page 8. Section 1.A.1 (Technical Thrusts) is amended to clarify the analysis expected by adding the following paragraph: "For Phase 1, off-line implementation of the signal processing algorithms is sufficient; real-time implementation is planned for later phases. During Phase 1, offerors should analyze algorithm performance for real time considerations including such factors as operations count, memory requirements, and data flow needs." 4. Page 12. Section 1B (Program Milestone and Metrics) Table 3, month 6 milestone is amended to clarify expectations. 5. Page 13. Section 1B (Program Milestone and Metrics) is amended to correct the table numbering to "Table 4". 6. Page 13. Section 1B (Program Milestone and Metrics) Table 4 is amended to clarify the Month 16 milestone description. 7. Page 22. Section 4.B.1, Section 3: (Detailed Proposal Information), Paragraph E is amended to clarify the expectation for the intellectual property approach description. 8. Pages 26 and 44. Section 4.E (Other Submission Requirements) and the title of Appendix E, Table E1 are amended to remove ambiguity about the government test equipment. Questions may be submitted to dni-iarpa-baa-11-07@ugov.gov.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/4f9e3db1dfa3df0e5b4eb8e3b43f2fc3)
- Record
- SN02508911-W 20110727/110725234339-4f9e3db1dfa3df0e5b4eb8e3b43f2fc3 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |