Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 22, 2011 FBO #3527
MODIFICATION

Z -- Repair HVAC Bldg. 7359 & Replace Two 500 Ton Chillers Bldg. 2014

Notice Date
7/20/2011
 
Notice Type
Modification/Amendment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Lackland AFB - 802th Contracting Squadron, 1655 Selfridge Avenue, Lackland AFB, Texas, 78236-5253, United States
 
ZIP Code
78236-5253
 
Solicitation Number
FA3047-11-B-0006-RepairHVAC_Bldg7359_and_Replace_Chillers_Bldg2014
 
Point of Contact
RYAN D. BUENO, Phone: 2109251842, Jackie L. Murray, Phone: 2106711711
 
E-Mail Address
Ryan.bueno.1@us.af.mil, jackie.murray@lackland.af.mil
(Ryan.bueno.1@us.af.mil, jackie.murray@lackland.af.mil)
 
Small Business Set-Aside
HUBZone
 
Description
***NO QUESTIONS WILL BE ACCEPTED FOR ANSWER AFTER "23 JUL 2011" IN ACCORDANCE WITH INVITATION FOR BID (IFB), page 9, SECTION H " Special Contract Requirements." Question 1: In the walk Chiller Walk Thru of Buildings #2014 & #7359 I noticed that there were Trane Chillers and Millennium Chillers in use. Is this bid restricted to the use of any specific Chiller manufacturers? If so who is or is not acceptable? Pending Government Response: Question 2: In the walk Chiller Walk Thru of Buildings #2014 & #7359 I noticed that there were Trane Chillers and Millennium Chillers in use. Trane Chillers use R-123 refrigerants, will this product be acceptable and compatible for the equipment related to this bid? Pending Government Response: Question 3: Will you consider changing the bid day from Monday to Tuesday? Pending Government Response: Question 4: Will the government retain possession of the "demo-ed" equipment and if so will it Remove the equipment from the site? Pending Government Response: Question 5: Do piping connections need to be made for temporary Chillers? Pending Government Response: Question 6: Are there any design requirements for either building? Pending Government Response: Question 7: It is our understanding that only the 6 items listed in the SOW for bldg 2014 are to be replaced along with piping or electrical modifications required to complete the replacement. Is this correct? Pending Government Response: Question 8: What material specifications are we to use for building 2014? (Pipe, Insulation, and Etc.) Pending Government Response: Question 9: Will the locations be completed consecutively or concurrently? Pending Government Response: Question 10: What are the QC manager requirements? Can the Supt be the QC Manager? Pending Government Response: Question 11: Who will get possession of the existing equipment (chillers, pumps etc.)? Pending Government Response: Question 12: Building 7359-Piping Plan, Detail 2/M101 Will the piping labeled "Option 1" located on the interior of the mechanical room be included in the Base Bid line item pricing? Pending Government Response: Question 13: Building 7315- Please provide specifications on the electrical utility primary tap box. Pending Government Response: Question 14: Building 7315 - Please provide specifications for the electrical metering equipment. Pending Government Response: Question 15: Building 2014 - TEMPORARY COOLING Due to the limited capacity on the existing electrical power, a water cooled temporary cooling system would be more efficient and practical than an air cooled system. Can a water cooled system be substituted for the air cooled temporary cooling system? Pending Government Response: Question 16: Building 2014 - Statement of Work, Page 2, paragraph 3.2.4- The contractor is instructed to install new piping and modify the existing piping as required for the new condenser water pumps. There is no mention of the actual point of connection. Please clarify if the point on connection will be made before the "accessories" i.e. thermometer, flow switch, differential pressure gauge, isolation valves, etc. or after the "accessories". Please provide a detail drawing similar to detail 3/M301 showing point of connection and piping accessory requirements. Pending Government Response: Question 17: Building 2014- Can the existing HVAC system be shut down to install the temporary cooling system? Pending Government Response:
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AETC/LackAFBCS/FA3047-11-B-0006-RepairHVAC_Bldg7359_and_Replace_Chillers_Bldg2014/listing.html)
 
Place of Performance
Address: LACKLAND AFB, TX, LACKLAND AFB, Texas, 78236, United States
Zip Code: 78236
 
Record
SN02505320-W 20110722/110721004211-691aacaedb4f023cea6655d7552be9db (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.