AWARD
Z -- Building 50 Elevator Installation at the Jefferson Lab Campus
- Notice Date
- 7/8/2011
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of Health and Human Services, Food and Drug Administration, Office of Acquisitions and Grants Services, Bldg 50 Room 422, Jefferson, Arkansas, 72079, United States
- ZIP Code
- 72079
- Solicitation Number
- 11-223-SOL-00030
- Archive Date
- 7/20/2011
- Point of Contact
- Nicholas E Sartain, Phone: 870-543-7370
- E-Mail Address
-
nick.sartain@fda.hhs.gov
(nick.sartain@fda.hhs.gov)
- Small Business Set-Aside
- N/A
- Award Number
- HHSF223201110070C
- Award Date
- 7/5/2011
- Awardee
- DVC, Inc., 1314 Main St. Ste A, North Little Rock, Arkansas 72114, United States
- Award Amount
- $569,144.00
- Line Number
- Base and all options
- Description
- The Food and Drug Administration, Jefferson Lab Complex in Jefferson, Arkansas, has awarded a contract to provide and install a 2,100 lb. capacity passenger elevator system in building 50. The scope of work consists of installing a complete and fully operational 2100 lb. Capacity Seven Floor Passenger Elevator System in Building 50. The new system will be installed per existing construction drawings and manufacturer's specifications and it shall meet all federal and state safety code requirements. It is a stand-alone system. The Firm shall provide all materials, labor and equipment necessary to prepare the existing shaft to receive the new system and then install the new system in its entirety. The Firm is responsible for the testing of all system parts and components to verify that they are in working order prior to installation, and if there is any part or component failure after installation the Firm will replace the parts or components at no cost to the government. The contractor is responsible for the installation of all architectural, electrical (including a 480 volt grounded transformer), mechanical, and any other requirements associated with the new system at each floor. The Firm is also responsible for all testing requirements. Upon completion of construction, the Firm shall provide operational testing to demonstrate 100% successful performance prior to commissioning of system. The Firm shall also provide as-built drawings, four (4) sets of O & M manuals and four (4) hours of training. Optional items include replacing the existing passenger elevator system and extended warranties on both elevators.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/HHS/FDA/NCTR/Awards/HHSF223201110070C.html)
- Record
- SN02493912-W 20110710/110708235321-76d7bcb320798aca032207bcc42504a8 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |