Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 01, 2011 FBO #3506
SOLICITATION NOTICE

39 -- HEAVY DUTY LINE DOCK - SHIPPING INSTRUCTIONS

Notice Date
6/29/2011
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
423830 — Industrial Machinery and Equipment Merchant Wholesalers
 
Contracting Office
Other Defense Agencies, U.S. Special Operations Command, Special Operation Forces Support Activity (SOFSA), 5749 BRIAR HILL ROAD, LEXINGTON, Kentucky, 40516-9723
 
ZIP Code
40516-9723
 
Solicitation Number
F3UUKH1149A010-A012
 
Archive Date
7/21/2011
 
Point of Contact
Anthony E. Cheever, Phone: DSN 318 421-7727, TSgt Rosita Goodrum, Phone: DSN 318 421-7718
 
E-Mail Address
anthony.cheever@afghan.swa.army.mil, rosita.goodrum@afghan.swa.army.mil
(anthony.cheever@afghan.swa.army.mil, rosita.goodrum@afghan.swa.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Shipping Instructions for Dover, DE and to Kandahar, Afghanistan Please read the entire solicitation carefully before submitting your quote. Quote not conforming to the specifications herein will be disqualified and discarded. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-52. This solicitation is issued as a request for quotation IAW FAR Part 12 and 13. Submit written quotes in reference to Request for Quote (RFQ) reference number F3UUKH1149A010 / A011 / A012. Kandahar Airfield Regional Contracting Center (RCC) intends to award a firm-fixed price contract for Heavy Duty High Line Dock (Gravity Roller Conveyor) to be delivered to Kandahar Airfield, Herat, and Camp Bastion, Afghanistan. Due to the overseas location of this requirement, no set-aside will be used. The North American Industry Classification System (NAICS) code for this requirement is 423830- Industrial Machinery and Equipment Merchant Wholesalers Please provide a quote for the following items: OPEN MARKET Line Item Number Description Quantity Unit Price Per Unit Total 0001 Heavy Duty Line Dock (Gravity Roller Conveyor) IAS Model #HLD-50-2 OR EQUAL * Salient Characteristics: See Below 1 Each 0002 Shipping to Dover AFB, DE and final destination DET 4, Herat, Afghanistan 1 Lump Sum 0003 Heavy Duty Line Dock (Gravity Roller Conveyor) IAS Model #HLD-50-2 OR EQUAL * Salient Characteristics: See Below 2 Each 0004 Shipping to Dover AFB, DE and final destination DET 1, Camp Bastion, Afghanistan 1 Lump Sum 0005 Heavy Duty Line Dock (Gravity Roller Conveyor) IAS Model #HLD-50-2 OR EQUAL * Salient Characteristics: See Below 2 Each 0006 Shipping to Dover AFB, DE and final destination Kandahar Airfield, Afghanistan 1 Lump Sum TOTAL PRICE * Salient Characteristics: Heavy duty high line docks capable of handling six (6) 463L pallets of 10,000 lbs each for a total of 60,000 lbs. Loading either from the ends or sides of the dock. Holds up to 60,000 lbs and containers 108 inches wide. Additional intermediate frames that strengthen side load sections. Smooth fork tine protection that eliminates catch points. Self-aligning couplings which allows for uniform stop operation. Addendum to 52.212-1 Instructions to Offerors: To assure timely and equitable evaluation of quotes, Offerors must follow the instruction contained herein. Failure to follow these directions may result in immediate elimination of an Offeror's quote from contract award consideration. Quotes must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Any required items missing from the solicitation, may result in the offer being considered non-responsive and not be considered for award. The quote should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their experience, and will base its evaluation on the information presented in the Offeror's quote. The Offeror's quote shall be submitted electronically to: Mr. Anthony Cheever, Acquisition Analyst, at anthony.cheever@afghan.swa.army.mil TSgt Rosita Goodrum, Contracting Officer, at rosita.goodrum@afghan.swa.army.mil Questions concerning this solicitation shall be addressed to the Contracting Officer via email; inquires by phone will not be addressed. Responses to any other email addresses will be considered invalid. All quotes must be received no later than 8:00 AM local Kandahar, Afghanistan time on 7 July 2011. Failure to respond by this time, for any reason, will eliminate your quote from consideration. Provide your CAGE code or JCCS ID number in your quote. The Offeror's quote shall consist of three parts as follows: Part 1 - Price At a minimum, offerors shall fill out the pricing schedule listed above in this solicitation to be considered for award. The offer shall be provided in U.S. Dollars for evaluation; Offerors must insert in U.S. Dollars the proposed unit price and extended prices in the pricing schedule for each contract line item (CLIN). Part 2 - Technical Capability The offeror shall provide a technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, written narratives/plans or other documents, if necessary. Part 3 - Past Performance The offeror shall provide past performance information to include recent and relevant contracts for the same or similar items/services and other references (including contract numbers, points of contact with telephone numbers and other relevant information); recent is defined as being within two years from the date of solicitation issuance. Contracts provided shall not exceed a quantity of five. 52.212-2 Evaluation - Commercial Items (JAN 1999) (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose technically acceptable offer conforming to the solicitation is the lowest price. All offers will be ranked by price and evaluated for technical acceptability starting with the low offer until the Lowest Price Technically Acceptable offer is identified. The following areas will be evaluated: Part 1 - Price: The total evaluated price will be calculated as the sum of all Contract Line Item Numbers (CLINs) unit/extended prices. Offerors that provide incomplete pricing information or pricing information not in U.S. Dollars will be rated as unacceptable and not be considered for award. Part 2 - Technical Capability: In order to be considered acceptable, offerors must provide documentation that demonstrates knowledge and understanding of the requirement to include full compliance with the solicitation. Technical capability will be determined by the documentation provided by the contractor as requested in this solicitation. Part 3- Past Performance: Satisfactory past performance information will be based on information such as the contracting officer's knowledge of the requirement, customer surveys, or other reasonable basis. Offerors that have no relevant past performance history will be assigned a neutral past performance evaluation rating which equates to acceptable. A contractor which has negative past performance or has been terminated for cause or default may be considered unacceptable. The following clauses and provisions apply to this solicitation and are included either by reference or full text: The full text of the FAR and DFAR can be accessed on the Internet at http://farsite.hill.af.mil CLAUSES INCORPORATED BY REFERENCE 52.211-6 Brand Name or Equal APR 1999 52.212-1 52.212-3 Instructions to Offerors-Commercial Items Offeror Representations and Certification--Commercial Items JUN 2008 MAY 2011 52.212-4 Contract Terms and Conditions--Commercial Items JUN 2010 52.232-1 52.232-17 52.233-1 252.203-7002 Payments Interest Disputes Requirement to Inform Employees of Whistleblower Rights APR 1984 OCT 2010 JUL 2002 JAN 2009 252.204-7003 252.209-7001 Control of Government Personnel Work Product Disclosure of Ownership or Control by the Government of a Terrorist Country APR 1992 APR 2010 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country DEC 2006 252.225-7002 Qualifying Country Sources As Subcontractors APR 2003 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports MAR 2008 252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.243-7001 252.247-7022 Pricing of Contract Modifications Representation Of Extent Of Transportation Of Supplies By Sea DEC 1991 AUG 1992 CLAUSES INCORPORATED BY FULL TEXT 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2011) (a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)). ___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)). (2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553). (3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78). (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2010) (Pub. L. 109-282) (31 U.S.C. 6101 note). 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010) (31 U.S.C. 6101 note). (Applies to contracts over $30,000). (Not applicable to subcontracts for the acquisition of commercially available off-the-shelf items). 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JUL 2010) (E.O. 13126). 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). 52.232-33, Payment by Electronic Funds Transfer--Central Contractor Registration (OCT 2003) (31 U.S.C. 3332). (d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation. (1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract. (2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved. (3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law. (e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause- (i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note). (ii) 52.219-8, Utilization of Small Business Concerns (DEC 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities. (iii) Reserved. (iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246). (v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212). (vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 1998) (29 U.S.C. 793). (vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40. (viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.). (ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)). Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)). (x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.). (xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (FEB 2009) (41 U.S.C. 351, et seq.). (xii) 52.222-54, Employment Eligibility Verification (JAN 2009). (xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6. (xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64. (2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations. (End of clause) 52.233-2 SERVICE OF PROTEST (SEP 2006) (a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from KAF RCC APO AE 09355 ____. (Contracting Officer designate the official or location where a protest may be served on the Contracting Officer.) (b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO. (End of provision) 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/ (End of provision) 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/ (End of clause) 252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (JUN 2011) (b) The Contractor agrees to comply with any clause that is checked on the following list of Defense FAR Supplement clauses which, if checked, is included in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components. 252.203-7000, Requirements Relating to Compensation of Former DoD Officials (JAN 2009) (Section 847 of Pub. L. 110-181). 252.225-7001, Buy American Act and Balance of Payments Program (JAN 2009) (41 U.S.C. 10a-10d, E.O. 10582). 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631). 252.247-7024, Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631). (c) In addition to the clauses listed in paragraph (e) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5), the Contractor shall include the terms of the following clauses, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract: (1) 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84). (2) 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Public Law 108-375). (3) 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Public Law 110-417). (4) 252.247-7023, ALT III, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631). (5) 252.247-7024, Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631). (End of clause) C 3 CLAUSE 952.201-0001 OMBUDSMAN (NOV 2010) (a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern. (b) Before consulting with an ombudsman, interested parties must address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMBC-A-76 competition performance decisions). (c) If resolution cannot be made by the contracting officer, concerned parties may contact the C3 Ombudsman at: Office of the Senior Contracting Official - Afghanistan Attn: SCO-A Ombudsman APO, AE 09356 E-Mail: NKCSCO-APol.org@afghan.swa.army.mil (d) The ombudsman has no authority to render a decision that binds the agency. (e) Do not contact the ombudsman to request copies of the solicitation, contract, delivery order, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer. C3 952.225-0006 Contractor Delivery Requirements (Jul 2010) (a) REQUIRED DELIVERY DATE : TBD (b) CONTRACTOR DELIVERY LOCATION : (SEE SHIPPING INSTRUCTIONS) Delivery address: 436 APS TMO Truck Dock 550 Atlantic Street Dover AFB DE 19902 Final destination "SHIP TO" address: CLIN 0001 - 0002: 451 ELRS/DET 4 HERAT APO AE 09355 CHARLES BRANUM Charles.l.branum@afghan.swa.army.mil DSN: 318 420-2768 CLIN 0003 - 0004: 451 ELRS/DET 1 CAMP BASTION APO AE 09355 CAPT JAMES PRUCHNIC James.pruchnic@afg.usmc.mil DSN: 318 357-6557 CLIN 0005 - 0006: SUPPLY SUPPORT ACTIVITY 742D SMC KANDAHAR AIRFIELD, AFGHANISTAN APO AE 09355 SHANNON TIMMERMAN Shannon.timmerman@afghan.swa.swa.army.mil TEL: 079-338-5360387, Military Shipment Label (bar coded) - Glue or tape to outside of container Attn: 451 ELRS/LGRA CAPT DONALD BURKE Donald.burke@kdab.afcent.af.mil DSN: 318 420-2402 (c) POINT-OF-CONTACT RESPONSIBLE FOR INSPECTION & ACCEPTANCE: Name: same as above Phone No.: same as above Email: same as above (d) FINAL DELIVERY DESTINATION : same as above (e) POINT-OF-CONTACT AT FINAL DESTINATION : Name: same as above. Phone No.: same as above. Email: same as above. (f) REQUIRING ACTIVITY : 451 ELRS C3 952.232-0005 Wide Area Workflow Instructions (Jul 2010) (a) To implement DFARS Clause 252.232-7003, "ELECTRONIC SUBMISSION OF PAYMENT REQUESTS," C3 uses Wide Area Workflow - Receipt and Acceptance (WAWF-RA) to electronically process contractor requests for payment. This application allows DOD contractors to submit and track invoices and receipt/acceptance documents electronically. (b) The contractor is required to use WAWF-RA when processing invoices and receiving reports under this procurement action. Submission of hard copy DD250/invoices will no longer be accepted for payment except as provided in paragraph 3 of this clause. (c) The Contractor may submit a payment request using other than WAWF-RA only when: (1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF-RA; (2) DoD is unable to receive a payment request in electronic form; or (3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment. (d) INSTRUCTIONS: The contractor shall register to use WAWF at https://wawf.eb.mil. There is no charge to use WAWF. All questions relating to system setup and vendor training can be directed to the help desk in Ogden, UT. Their number is 1-866-618-5988. Web-based training for WAWF is also available at http://www.wawftraining.com/. (e) DESCRIPTION OF WAWF-RA TYPES OF INVOICE/RECEIVING REPORTS: (1) Progress Payment (For use under contractually authorized Progress Payments) (2) Performance Based Payment (For use under contractually authorized Performance Based Payments) (3) "COMBO" Invoice/Receiving Report (For Supply CLINS including ammunition items and ammunition related items) (4) "2-in-1" (For Service CLINS only) (5) Cost Voucher (For use with Cost Reimbursement contracts, Time and Material or Labor Hour contracts containing FAR Clauses 52.216-7, "Allowable Cost and Payment" or 52.232-7, "Payments under Time-and-Materials and Labor-Hour Contracts") (f) CODES: THE FOLLOWING CODES ARE REQUIRED TO ROUTE CONTRACTOR INVOICES THROUGH WAWF: Contractor CAGE Code* ____________ Pay DoDAAC (Department of Defense Activity Address Code)*: Issue DoDAAC*: C 3 PROVISION 952.233-0001 C 3 AGENCY PROTEST PROGRAM (NOV 2010) (a) This solicitation may be protested to the issuing Contracting Office for decision by the Contracting Officer or by the Chief of the Regional Contracting Center if authority has been withheld. If requested, an independent review of an Agency Protest decision is available through appeal to the Principal Assistant Responsible for Contracting (PARC)/Senior Contracting Official (SCO) in accordance with FAR 33.103. A protest to C 3 is a "PROTEST TO THE AGENCY," within the meaning of FAR 33.103. The C 3 Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns within C 3, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. After an interested party files an Agency Protest with the Contracting Officer and while that protest is pending, the protestor agrees not to file a protest with the GAO or other external forum. If a protest is filed with an external forum on the same solicitation as the Agency Protest, the Agency Protest will be dismissed. (b) An interested party may file a written protest to the Contracting Officer under the C 3 Agency Protest program for contract solicitations issued by C 3. Such Agency Protests are limited to objections to any of the following: (1) A solicitation or other request by an agency for offers for a contract for the procurement of property or services. (2) The cancellation of the solicitation or other request. (3) An award or proposed award of the contract. (4) A termination or cancellation of an award of the contract, if the written objection contains an allegation that the termination or cancellation is based in whole or in part on improprieties concerning the award of the contract. (c) An Executive-Level Agency protest may be filed with the Contracting Officer designated in paragraph (f) of this provision for resolution of protests. (d) For the purpose of filing a C 3 Agency Protest, an interested party means an actual or prospective bidder or offeror whose direct economic interest would be affected by the award of a contract or by the failure to award a contract. (e) An Agency Protest must include the protester's name, address and telephone number, including fax number or e-mail address; the solicitation or contract number, identity of the contracting activity and the contracting officer's name; a detailed statement of all legal and factual grounds for protest (mere disagreement with the decisions of Contracting Officers does not constitute grounds for protest), including copies of all relevant documents; a request for a ruling; and, a request for relief. All protests must be signed by an authorized representative of the protester and must state it is an Agency Protest for decision by the Contracting Officer. (f) C 3 Agency Protests, as defined in FAR 33.101, may be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from TSgt Rosita Goodrum at rosita.goodrum@afghan.swa.army.mil. In accordance with FAR 13.004 -- Legal Effect of Quotations the following information is provided in regards to quotations. A quotation is not an offer and, consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of an order in response to a supplier's quotation does not establish a contract. The order is an offer by the Government to the supplier to buy certain supplies or services upon specified terms and conditions. A contract is established when the supplier accepts the offer. When appropriate, the contracting officer may ask the supplier to indicate acceptance of an order by notification to the Government, preferably in writing. In other circumstances, the supplier may indicate acceptance by furnishing the supplies or services ordered or by proceeding with the work to the point where substantial performance has occurred. If the Government issues an order resulting from a quotation, the Government may (by written notice to the supplier, at any time before acceptance occurs) withdraw, amend, or cancel its offer. INVOICES-BLOCK 18b of SF 1449: Submit original invoice to the following address, or email them to: KAF RCC INVOICES KAF Regional Contracting Center APO AE 09355 E-Mail- KAFRCCINVOICES@afghan.swa.army.mil Invoice must include the following information: Contract Number from Block #2 Delivery Order Number From Block #4 if applicable Your name and address Invoice Date Invoice Number Description of items delivered must match the CLIN'S Terms for any discount for prompt payment offered Name, title and phone number of company point of contact to notify in the case of a defective invoice Electronic Funds Transfer Information Company Name Beneficiary (Name on Account) Company Address Bank Name Routing Number Account Number
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/ODA/USSOCOM/SOFSA/F3UUKH1149A010-A012/listing.html)
 
Place of Performance
Address: KANDAHAR AIRFIELD REGIONAL CONTRACTING CENTER (KAF RCC), APO AE 09355, KANDAHAR, Non-U.S., Afghanistan
 
Record
SN02486119-W 20110701/110629235431-6461a552add15209121a0b312d56780a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.