Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 15, 2011 FBO #3490
SOURCES SOUGHT

Z -- Garrison West Terrace Gravel Relief Well Outfall Design & Construct

Notice Date
6/13/2011
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
 
ZIP Code
68102-4901
 
Solicitation Number
W59XQG10964579
 
Response Due
6/23/2011
 
Archive Date
8/22/2011
 
Point of Contact
Donald D. Miller, 402-995-2051
 
E-Mail Address
USACE District, Omaha
(donald.d.miller@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Description of Work to be Performed: Work will generally consist of replacing select manholes, subdrains, and observation risers in addition to the installation of 8 relief well outfall pipes adjacent to the powerhouse switchyard area at the downstream toe of the Garrison Dam near Riverdale, North Dakota. Current groundwater levels are influenced considerably by upstream pool conditions and will require both engineered dewatering systems and shoring systems for construction. Phase I shall consist of the replacement of approximately 300 lineal feet of 12-inch perforated vitrified clay subdrain and riser pipe, and all ancillary work, located at the base of the North Powerhouse Slope. The replacement will require 10-12 foot deep excavations into saturated sands. The Contractor will be required to design and install temporary shoring and dewatering systems to establish a dry work area, prevent caving of sands, and protect the adjacent foundation soils supporting a road and an engineered cut slope currently situated on either side of the proposed excavation. Phase I work will also require the installation of a manhole and replacement of a section of paved concrete gutter and catch basin. Phase II shall consist of the replacement of 3 manholes and approximately 160 lineal feet of 12-inch perforated subdrain and all auxiliary work, within the Powerhouse Relief Well Drainage System. Eight (8) previously constructed replacement relief wells, installed in 2010, shall be connected to the new manholes via outfall pipes using approximately 165 lineal foot of pipe. Work will also include the abandonment of existing relief wells and the removal of the former collection system in this area. The replacement will require 8-10 foot deep excavations into saturated sands. The Contractor will be required to design and install temporary shoring and dewatering systems to establish a dry work area, prevent caving of sands, and protect the adjacent foundation soils supporting the existing engineered cut slopes that are situated on either side of the proposed excavation. A considerable amount of information from previous boring programs and recent piezometer observations are available for the Contractors use in their design of the temporary dewateraing and shoring systems. Interested parties should email their capabilities packages to donald.d.miller@usace.army.mil NLT 2:00 PM CST, 23 Jun 2011.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W59XQG10964579/listing.html)
 
Place of Performance
Address: USACE District, Omaha 1616 Capital Ave, Omaha NE
Zip Code: 68102-4901
 
Record
SN02470990-W 20110615/110613234313-ba1c7050bae53e0099f7708faa0eec03 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers