MODIFICATION
Z -- DEWEY CREEK CULVERT PROJECT
- Notice Date
- 6/7/2011
- Notice Type
- Modification/Amendment
- NAICS
- 237110
— Water and Sewer Line and Related Structures Construction
- Contracting Office
- Forest Service - R-4 SW Idaho/Nevada Acquisition Office
- ZIP Code
- 00000
- Solicitation Number
- AG-0261-S-11-0053
- Archive Date
- 7/15/2011
- Point of Contact
- KAREN L. MORTHLAND, Phone: 2083734115, Ben Hipple, Phone: 2086340760
- E-Mail Address
-
KMORTHLAND@FS.FED.US, bhipple@fs.fed.us
(KMORTHLAND@FS.FED.US, bhipple@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- DEWEY CREEK CULVERT PROJECT -- PAYETTE NATIONAL FOREST IN APPROXIMATELY 15 DAY'S, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT. The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. This work consists of installing a government supplied precast concrete box culvert sections and precast footings. This work includes payment to load the precast box and steel connection plates at the Council Ranger Station yard and hauling it to the Dewey Creek site, and installing the box culvert at Dewey Creek. The work includes welding of the steel connection plates, and supplying and installing the nonshrink grout as shown on the drawings done by AMCOR. The work also includes the fabrication and installation of the eyebolts on the inlet and the anchor sleeves and fence posts on the outlet. LOCATION AND DESCRIPTION The site may be reached from New Meadows by driving south on highway 95 approx. 8 miles to the Strawberry road. Turn left on Strawberry road and follow it approx. 1 mile to the Beaver creek road No. 50169. Turn left on Beaver creek Road No. 50169 and follow it approx. 9 miles to the Joker Creek rd. Follow the Joker Creek road No. 486 approx. 3 miles to the East Fork Wieser Road 50172. At East Fork Weiser road turn right and follow it approx. 200 ft. to the Dewey Creek Road No. 50487. Turn left on road 50487 and follow it approx. 2 miles to the Dewey Creek crossing. This is the project location. Alternatively the project may be reached from council by driving north on highway 95 approx. 17 miles to the Strawberry road then following the directions above. Alternate routes are available but please note that due to flood damage in 2010 many roads will be closed for repair and reconstruction. CONTACT BEN HIPPLE (208) 634-0760 FOR MORE INFORMATION. ESTIMATED PRICE RANGE - Between $25,000 and $100,000 CONTRACT TIME WILL BE 21 days with an estimated start date of July 15, 2011. NAICS Code: 237110 Size Standard: $33.5. This proposed procurement is a TOTAL SMALL BUSINESS set aside.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-11-0053/listing.html)
- Place of Performance
- Address: PAYETTE NATIONAL FOREST, MCCALL, Idaho, United States
- Record
- SN02466092-W 20110609/110607234915-2104944588dfa0885cb3b9030b986ff1 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |