Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 28, 2011 FBO #3442
SOLICITATION NOTICE

15 -- 1560, TUBE ASSEMBLY, SUPPORT, H-60 HELICOPTERS

Notice Date
4/26/2011
 
Notice Type
Presolicitation
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
Defense Logistics Agency, DLA Acquisition Locations, DLA Aviation - BSM, 8000 Jefferson Davis Highway, Richmond, Virginia, 23297-5000, United States
 
ZIP Code
23297-5000
 
Solicitation Number
SPM4A7-11-R-1986
 
Archive Date
7/26/2011
 
Point of Contact
Heather M. Elkhay, Phone: (804) 279-6528, Stephen Allgeier, Phone: 804-279-4105
 
E-Mail Address
heather.elkhay@dla.mil, steve.allgeier@dla.mil
(heather.elkhay@dla.mil, steve.allgeier@dla.mil)
 
Small Business Set-Aside
N/A
 
Description
IQC11091009011, ISSUE DATE 05 MAY 2011/ CLOSING 06 JUNE 2011 This solicitation is intended to result in an Indefinite Quantity Contract (IQC) for NSN 1560-01-116-4713, Tube Assembly, Support. The contract term is a base and four option periods. The maximum contract term is five years. A flexible option is included. IAW SIKORSKY AIRCRAFT CAGE: 78286, DWG 70361-10003 REV "J" DTD 18JAN98 & AMCOM,CAGE 81996 PROCUREMENT PACKAGE 70361-10003 REV 'E' DTD 29NOV04 P/N: 70361-10003-043. Approved Sources: AIR INDUSTRIES MACHINING CORP CAGE 8L513 SIKORSKY AIRCRAFT CAGE 78286 Item is configuration control. Item is critical application item. Solicitation is issued Unrestricted, Other Than Full and Open. Estimated annual demand is 240 each. Guaranteed minimum is 60 each, base year only. Maximum Annual Contract quantity is 360. Delivery order quantities will be 60 minimum to 240 maximum. The following terms apply: FOB Destination, Inspection/Acceptance Origin, higher level inspection requirements and measuring and testing apply. Government First Article Testing (2 each) and Contractor Production Lot Testing apply. Requested delivery schedule is as follows: Government FAT delivery is 200 DARO OBO, Contractor PLT delivery is 200 Days After FAT Approval (OBO) and production delivery is 10 Days (OBO) after PLT approval. Should FAT be waived, PLT deliver is 200 DARO (OBO) and production delivery is 10 Days (OBO) after PLT approval Ship to CONUS stock locations, as specified on delivery order. Electronic offers are not acceptable. The solicitation may be obtained by going to http://www.dibbs.bsm.dla.mil. The technical data package will be available on DIBBS in CFolders. The solicitation will be available on or about May 05, 2011.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DLA/J3/DSCR-BSM/SPM4A7-11-R-1986/listing.html)
 
Record
SN02433785-W 20110428/110426234924-faff7b139a5342fccfbc9f2abd813349 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.