Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 31, 2011 FBO #3414
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER P-793, Award Notice for Modify Chilled Water Systems, Buildings 3291 and 3909, NAS Pensacola, FL

Notice Date
3/29/2011
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N69450 NAVFAC SOUTHEAST, PENSACOLA 310 John Tower Road Bldg 3560 NAS Pensacola Pensacola, FL
 
ZIP Code
00000
 
Solicitation Number
N6945011R6363
 
Archive Date
5/30/2011
 
Point of Contact
Roger Odom, 850-452-3131 ext 3080
 
Small Business Set-Aside
N/A
 
Award Number
N6945011C6363
 
Award Date
3/29/2011
 
Awardee
Oneida Total Integrated Enterprises, LLC (DUNS 830528415)<br />
 
Award Amount
$3,011,980.00
 
Line Number
0001 - 0002
 
Description
This contract action was accomplished using other than competitive proceddures because a statute exists that exxpressly authorizes or requires that the acquisition be made from a specific source (FAR 6.302-5(b)(4); specifically a sole source award under the 8(a). Per FAR 6.302-5 a J&A is not required for this award. B3909: Modify the primary-secondary configuration to a variable-primary-flow configuration, replace chiller. Remove chiller CH-1, along with associated primary (P-4) and condenser water pump (P-8); furnish and install new 1,000-ton water-cooled chiller, primary chilled water condenser pump, modify equipment pads and electrical service. Furnish and install controls required to connect new equipment to existing Direct Digital Control (DDC) system, install new variable speed drives (VFD) on remaining existing primary and condenser water pumps, modify bridge piping into minimum-flow bypass with control valve; install new temperature sensors. Replace cooling tower components as necessary. B3291: Modify central chilled water plant to variable primary flow system, re-using existing chillers. Retrofit existing cooling towers with nozzles and dams, replace existing condenser water pumps, add VFDs to existing cooling tower fans, replace motors; modify cooling tower sequence of operation for maximum plant efficiency. Replace two existing primary chilled water pumps, install three new chilled water pumps, modify piping to unitize pumps with chillers. Install differential pressure transmitters, install a minimum-flow bypass pipe with two-way control valve, adjust chilled water temperature set point for maximum plant efficiency. Replace cooling tower components as necessary.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62467V/Awards/N6945011C6363.html)
 
Record
SN02411454-W 20110331/110329234226-b1e7b75bc353ed72e065d459991c6e2e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.