AWARD

Y -- Intracoastal Waterway, Jacksonville to Miami Dredged Material Management Area (DMMA) IR-2 Indian River County, Florida

Notice Date
12/30/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
W912EP10R0036
 
Archive Date
1/29/2011
 
Point of Contact
Beau Corbett, 904-232-1388
 
E-Mail Address
USACE District, Jacksonville
(beau.corbett@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-11-C-0007
 
Award Date
12/30/2010
 
Awardee
BCPEABODY CONSTRUCTION SERVICES, INC. (791414563) <br> 509 GUISANDO DE AVILA STE 100<br> TAMPA, FL 33613-5235
 
Award Amount
$2,806,601.00
 
Description
The base consists of constructing an upland disposal area (IR-2) located in Indian River County, Florida. The disposal area dikes shall be constructed to an elevation of 14.0 ft NAVD 88. The project also includes requirements for clearing and grubbing, fencing, access road construction, weir structures, and slope protection. The dredged material containment basin will be surrounded by a perimeter access road and perimeter ditch. All slopes will be maintained at 3H:1V. The dikes crest elevation will be 14 ft NAVD and the basins bottom elevation shall be 1.5 ft. All excess material will be stockpiled onsite. Twin box riser weirs with composite weir boards will be employed for the decant water system. Wetland impact of 1.55 acres will be mitigated for onsite with 5.95 acres making up a small on-site mitigation bank. 9,000 square yards of temporary road stabilization will be constructed. When the dike construction is complete, the temporary road stabilization will be removed and the area will be seeded. Contractor will be required to obtain a $10,000,000 property damage liability insurance policy prior to start of construction. Option A: Pending modification to existing DEP permit, this option will be awarded to retain the temporary road stabilization. If this Option is awarded, the requirement for removal of the temporary road stabilization and seeding will be removed from the contract. Option B: Pending modification to existing DEP permit, this option will be awarded to add an additional 6,900 square yards of road stabilization. The Government reserves the right to award this Option at any time prior to demobilization. Option C: The base requires excess material to be stockpiled onsite. If funds are available, Option C will be exercised to dispose of the excess material offsite. The material becomes the property of the Contractor and is disposed of as he/she sees fit in accordance with all local, state and Federal laws and regulations.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/Awards/W912EP-11-C-0007.html)
 
Record
SN02352438-W 20110101/101230233643-072531b93679d243ddfd03c0903cbebe (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.