AWARD
Y -- Intracoastal Waterway, Jacksonville to Miami Dredged Material Management Area (DMMA) IR-2 Indian River County, Florida
- Notice Date
- 12/30/2010
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
- ZIP Code
- 32232-0019
- Solicitation Number
- W912EP10R0036
- Archive Date
- 1/29/2011
- Point of Contact
- Beau Corbett, 904-232-1388
- E-Mail Address
-
USACE District, Jacksonville
(beau.corbett@us.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912EP-11-C-0007
- Award Date
- 12/30/2010
- Awardee
- BCPEABODY CONSTRUCTION SERVICES, INC. (791414563) <br> 509 GUISANDO DE AVILA STE 100<br> TAMPA, FL 33613-5235
- Award Amount
- $2,806,601.00
- Description
- The base consists of constructing an upland disposal area (IR-2) located in Indian River County, Florida. The disposal area dikes shall be constructed to an elevation of 14.0 ft NAVD 88. The project also includes requirements for clearing and grubbing, fencing, access road construction, weir structures, and slope protection. The dredged material containment basin will be surrounded by a perimeter access road and perimeter ditch. All slopes will be maintained at 3H:1V. The dikes crest elevation will be 14 ft NAVD and the basins bottom elevation shall be 1.5 ft. All excess material will be stockpiled onsite. Twin box riser weirs with composite weir boards will be employed for the decant water system. Wetland impact of 1.55 acres will be mitigated for onsite with 5.95 acres making up a small on-site mitigation bank. 9,000 square yards of temporary road stabilization will be constructed. When the dike construction is complete, the temporary road stabilization will be removed and the area will be seeded. Contractor will be required to obtain a $10,000,000 property damage liability insurance policy prior to start of construction. Option A: Pending modification to existing DEP permit, this option will be awarded to retain the temporary road stabilization. If this Option is awarded, the requirement for removal of the temporary road stabilization and seeding will be removed from the contract. Option B: Pending modification to existing DEP permit, this option will be awarded to add an additional 6,900 square yards of road stabilization. The Government reserves the right to award this Option at any time prior to demobilization. Option C: The base requires excess material to be stockpiled onsite. If funds are available, Option C will be exercised to dispose of the excess material offsite. The material becomes the property of the Contractor and is disposed of as he/she sees fit in accordance with all local, state and Federal laws and regulations.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/Awards/W912EP-11-C-0007.html)
- Record
- SN02352438-W 20110101/101230233643-072531b93679d243ddfd03c0903cbebe (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |