Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 15, 2010 FBO #3308
SPECIAL NOTICE

Y -- RECOVERY--Y--PROJECT NUMBER A1775, Exterior Repairs, Bldg 20, U.S.A.S.S.C., Natick, MA.

Notice Date
12/13/2010
 
Notice Type
Special Notice
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
USACE District, New England, 696 Virginia Road, Concord, MA 01742-2751
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ-10-C-0009-P00001
 
Archive Date
3/13/2011
 
Point of Contact
Elandria M. Cameron, 9783188051
 
E-Mail Address
USACE District, New England
(elandria.m.cameron@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
JC-001, Change Flashing, Delete CMU, Additional Crack Repair Pursuant to the clause of this contract entitled "changes", provide all plant, labor, material and equipment to: A.Change the size of the copper flashing from 20-oz to 16-oz. B.Delete the removal of the second block above the flashing. C.Increase the estimated quantity of crack repair from 1,000 linear feet to approximately 1,591 linear feet. JC-013, Delete Paint/Multiple Changes Pursuant to the clause of this contract entitled "changes", provide all plant, labor, material and equipment to: A.Delete the paint on the exterior of the building. B.Install a reinforced, translucent tarp over the entire East and West walls. Cut out for 3 doors, the louvers in the Boiler Room and the two windows in the bathrooms. Secure the tarps using 2x4 and strapping to prevent the tarp from coming off during the winter. Caulk seams, edges and openings. Remove the tarps, caulking and wood in the spring, infill holes. Provide 8 man-hours per month for 4 months, (32 man-hours total) to maintain the tarp though the winter. C.Perform fifteen (15) tests for asbestos in the existing caulking around the windows and doors on the north, south, east and west walls. Remove and abate the caulking on the Boiler Room window and louver. D.At the Boiler Room window, remove the existing bond beam and install a new lintel, block, flashing and weeps At the Conference Room window, remove the existing bond beam and install a new lintel, block, flashing and weeps. E.Remove and replace 10 damaged CMU block. F.In the Mechanical Room, remove and replace the existing shut-off valve for the exterior hydrant.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA33/W912WJ-10-C-0009-P00001/listing.html)
 
Record
SN02343168-W 20101215/101213233927-117cc988d82539dc586d7be2ba0f4015 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.