Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 02, 2010 FBO #3295
SOLICITATION NOTICE

X -- MROTC Service for Hangar Space and Other Services

Notice Date
11/30/2010
 
Notice Type
Presolicitation
 
NAICS
488119 — Other Airport Operations
 
Contracting Office
DEPARTMENT OF THE AIR FORCE; 3001 STAFF DR STE 2AF68A; TINKERAFB; OK; 73145
 
ZIP Code
73145
 
Solicitation Number
FA8100-11-R-0004
 
Response Due
12/22/2010
 
Point of Contact
Caren Annesley, Phone 405-739-9120, Fax 405-736-8534, Emailcaren.annesley@tinker.af.mil - Tony Kyzer, Phone 405-739-3962, Fax405-736-8534, Email tony.kyzer@tinker.af.mil
 
E-Mail Address
Caren Annesley
(caren.annesley@tinker.af.mil)
 
Small Business Set-Aside
N/A
 
Description
PR Number(s): FD20301140099Item: 0001 Description: Description for Hangar 1: MROTC facility, located adjacentto Tinker AFB, OK, contains 32,592 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $2,355.00 per day(beginning 14 January 2011 and ending 30 September 2011). This will bea rental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 14 JAN 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 0002 Description: Description for Hangar 2: MROTC facility, located adjacentto Tinker AFB, OK, contains 61,831 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259days @ $3,725.00 per day(beginning 14 January 2011 and ending 30 September 2011). This will bea rental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 14 JAN 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 0003 Description: Description for Hangar 3: MROTC facility, located adjacentto Tinker AFB, OK, contains 61,831 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $3,725.00 per day(beginning 14 January 2011 and ending 30 September 2011). This will bea rental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 14 JAN 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 1001 Description: Description for Hangar 1: MROTC facility, located adjacentto Tinker AFB, OK, contains 32,592 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $2,355.00 per day(beginning 01 October 2011 and ending 31 March 2012). This will be arental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 01 OCT 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 1002 Description: Description for Hangar 2: MROTC facility, located adjacentto Tinker AFB, OK, contains 61,831 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $3,725.00 per day(beginning 01 October 2011 and ending 31 March 2012). This will be arental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 01 OCT 2011 Beginning Specified Date, 1.00 LO Plus 0007 additional items Duration of Contract Period: 14 January 2011 to 31 December 2012 if allOptions are exercised Electronic procedure will be used for this solicitation.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8100-11-R-0004/listing.html)
 
Record
SN02335532-W 20101202/101130234233-332c68abd9ee94a797f8c674ef9cf3e5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.