SOLICITATION NOTICE
X -- MROTC Service for Hangar Space and Other Services
- Notice Date
- 11/30/2010
- Notice Type
- Presolicitation
- NAICS
- 488119
— Other Airport Operations
- Contracting Office
- DEPARTMENT OF THE AIR FORCE; 3001 STAFF DR STE 2AF68A; TINKERAFB; OK; 73145
- ZIP Code
- 73145
- Solicitation Number
- FA8100-11-R-0004
- Response Due
- 12/22/2010
- Point of Contact
- Caren Annesley, Phone 405-739-9120, Fax 405-736-8534, Emailcaren.annesley@tinker.af.mil - Tony Kyzer, Phone 405-739-3962, Fax405-736-8534, Email tony.kyzer@tinker.af.mil
- E-Mail Address
-
Caren Annesley
(caren.annesley@tinker.af.mil)
- Small Business Set-Aside
- N/A
- Description
- PR Number(s): FD20301140099Item: 0001 Description: Description for Hangar 1: MROTC facility, located adjacentto Tinker AFB, OK, contains 32,592 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $2,355.00 per day(beginning 14 January 2011 and ending 30 September 2011). This will bea rental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 14 JAN 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 0002 Description: Description for Hangar 2: MROTC facility, located adjacentto Tinker AFB, OK, contains 61,831 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259days @ $3,725.00 per day(beginning 14 January 2011 and ending 30 September 2011). This will bea rental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 14 JAN 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 0003 Description: Description for Hangar 3: MROTC facility, located adjacentto Tinker AFB, OK, contains 61,831 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $3,725.00 per day(beginning 14 January 2011 and ending 30 September 2011). This will bea rental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 14 JAN 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 1001 Description: Description for Hangar 1: MROTC facility, located adjacentto Tinker AFB, OK, contains 32,592 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $2,355.00 per day(beginning 01 October 2011 and ending 31 March 2012). This will be arental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 01 OCT 2011 Beginning Specified Date, 1.00 LO PR Number(s): FD20301140099Item: 1002 Description: Description for Hangar 2: MROTC facility, located adjacentto Tinker AFB, OK, contains 61,831 sq ft. Contractor to furnish all labor, material, transportation andincidentals necessary to provide the services. The scope of thisproject is to acquire hangar space for the aircraft workload. Projectedestimated period of performance is 259 days @ $3,725.00 per day(beginning 01 October 2011 and ending 31 March 2012). This will be arental of the hangar space only. Any hazardous waste produced by theGovernment that cannot be disposed of at the contractor's facility willbe the Government's responsibility for disposal.Quantity: 1.0000 LO Destn: F3YCDB,TINKER AFB,OK,73145-. Delivery: 01 OCT 2011 Beginning Specified Date, 1.00 LO Plus 0007 additional items Duration of Contract Period: 14 January 2011 to 31 December 2012 if allOptions are exercised Electronic procedure will be used for this solicitation.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8100-11-R-0004/listing.html)
- Record
- SN02335532-W 20101202/101130234233-332c68abd9ee94a797f8c674ef9cf3e5 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |