Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 18, 2010 FBO #3281
MODIFICATION

Z -- Roof replacement of a standing seam metal roof at the WFO BRO in Brownsville TX - Amendment 1

Notice Date
11/16/2010
 
Notice Type
Modification/Amendment
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Western Acquisition Division-Boulder, 325 Broadway - MC3, Boulder, Colorado, 80305-3328, United States
 
ZIP Code
80305-3328
 
Solicitation Number
RA133W-11-RQ0030
 
Archive Date
12/30/2010
 
Point of Contact
Sue Bratton, Phone: 303-497-4973
 
E-Mail Address
Sue.Bratton@noaa.gov
(Sue.Bratton@noaa.gov)
 
Small Business Set-Aside
HUBZone
 
Description
SF1442 Revised Amendment 0002 - Revise SF1442, change due date to December 15, 2010 and include Addendum to Roof Replacement SOW, NWSFO, Brownsville TX as follows: 1. All Bidders must attend the site visit to inspect all proposed roof replacement work, and to acquire all necessary site information to properly prepare their Bid Proposal. Failure of the Contractor to visit the site and acquire all necessary site information to properly prepare their Bid Proposal shall not be acceptable cause to justify a later request for additional costs after Contract Award. 2. The mandatory Site Visit is scheduled for November 22, 2010 at 10:00. Bidders can contact the Jorge Negrete, Facility Engineering Technician, should they need directions. Mr Negete can be contacted at 830-606-3600 or email to jorge.negrete@noaa.gov. 3. All technical questions must be in writing and sent to Sue Bratton, Contract Specialist at sue.bratton@noaa.gov no later than 12:00 MST on November 24, 2010. 4. The Contractor shall provide separate Bid Proposal Line Item Costs (Cost Allotment) for the following work items: a. The Contractor as part of their Base Bid shall assume that a maximum of 100 lineal feet of existing wood fascia boards are rotted to the point which the boards shall be required to be replaced, and the Contractor shall provide a separate Line Item Cost (Allotment) for this assumed work. b. The Contractor as part of their Base Bid shall assume that a maximum of 130 square feet of existing steel roof decking panels are damaged by corrosion to the point which the panels shall be required to be replaced, and the Contractor shall provide a separate Line Item Cost (Cost Allotment) for this assumed work. The Contractor shall acknowledge that if all or any portion of the above Line Item Costs (Allotments) are not required to be used during the construction of the new roof, that the Contracting Officer shall have the sole right to reduce the final Contract Award amount by all or any portion of the above Line Item Costs (Allotments) that were not required to be used during the construction of the new roof. 5. As-Built Drawings of the building shall be made available at the NWS Forecast Office for viewing by the Bidders prior to their submission of their Bid Proposal.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NOAA/MASC/RA133W-11-RQ0030/listing.html)
 
Place of Performance
Address: WFO BRO, National Weather Service Forecast Office, BRO Brownsville TX, Brownsville, Texas, 78526, United States
Zip Code: 78526
 
Record
SN02327971-W 20101118/101116234127-5e9cd0de367a305231ffd2bf8e9dae34 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.