AWARD
56 -- RECOVERY--56--PROJECT NUMBER 8840, Harry S Truman Dam And Reservoir, MO Construction of Picnic Shelter Concrete Slabs, Adjacent Sidewalks and Installation of Prefabricated Picnic Shelters and Sidewalks and approach systems for Vault (See Desc)
- Notice Date
- 7/28/2010
- Notice Type
- Award Notice
- NAICS
- 238110
— Poured Concrete Foundation and Structure Contractors
- Contracting Office
- USACE District, Kansas City, ATTN: CENWK-CT, 700 Federal Building 60l East 12th Street, Kansas City, MO 64106-2896
- ZIP Code
- 64106-2896
- Solicitation Number
- W912DQ-10-T-0086
- Response Due
- 7/9/2010
- Archive Date
- 8/27/2010
- Point of Contact
- James D. Kindle, 660-438-7317
- E-Mail Address
-
USACE District, Kansas City
(james.d.kindle@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912DQ-10-P-0164
- Award Date
- 7/28/2010
- Awardee
- MCKINNEY CONSTRUCTION COMPANY L.L.C. (199384801)<br> 1004 E LOCUST ST<br> NEVADA, MO 64772-2724
- Award Amount
- $52,621.00
- Line Number
- 0001, 0003, 0004
- Description
- (Subject Continued) Toilets at various locations Contract Award Amount equals $7,420.00 Recovery Funds, and $45,201.00 Non-Recovery Funds. Specific Tasks 1.C.5.1 The Contractor shall provide all labor, equipment, material and transportation necessary to, Construct the sidewalks and approach systems at the following Vault Toilet locations: "Sparrowfoot 4 (four) "Windsor Crossing 1 (one) "Thibaut (Tebo) Pont 5 (five) "Talley Bend 1 (one) "Bucksaw 1 (one) "Bledsoe Ferry East 2 (two) "Bledsoe Ferry West 1 (one) "Long Shoal 3(three) "Osage Bluff 3 (three) "Fairfield Boat Ramp 1 (one) All work is to be performed as described in this Scope of Work, to include the attached sketches and specifications, as defined in the solicitation. Vault Toilet Approaches: a.Pads shall be 4 inches thick. b.Sidewalks shall be 4 inches thick except where noted on drawings. c.Concrete shall be 5.5 bag mix with air entraining. d. inch rebar shall be spaced no more than 24 inches apart each way in sidewalks. e. inch rebar shall be spaced 3 pieces lengthwise and 24 inches apart crossway in sidewalks. f.All sides shall be edged. g.Light broom finish. h.Pads shall be constructed within sketch dimensions. All pad sites will require either excavation and or fill to achieve grade where required. Borrow material for fill can be obtained from nearby locations designated by the COR. i.Top of concrete should extend to ground level around perimeter edge.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA41/W912DQ-10-T-0086/listing.html)
- Record
- SN02220762-W 20100730/100728235433-4653d7019261cdbcaddeefb1af7cdc0a (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |