SOLICITATION NOTICE
Y -- AZ PFH 49-1(1) and AZ ERFO 49-1(2)
- Notice Date
- 7/23/2010
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-10-B-00023
- Archive Date
- 9/30/2010
- Point of Contact
- Jeremiah B. Rogers, Phone: 7209633090, Lori T. Kliethermes, Phone: 7209633090
- E-Mail Address
-
jeremiah.rogers@dot.gov, lori.kliethermes@fhwa.dot.gov
(jeremiah.rogers@dot.gov, lori.kliethermes@fhwa.dot.gov)
- Small Business Set-Aside
- N/A
- Description
- This project is being advertised on a unrestricted "full and open" basis. PROJECT DETAILS This project is located within Tonto National Forest between Apache Junction, AZ and Roosevelt Dam. Apache Trail (SR88/FH49) is a designated scenic byway and historic road that travels some of the most rugged terrain in Arizona. This unpaved road varies from 12 to 22 feet in width. The project consists of 5 separate sites within a 2 mile stretch near Fish Creek Canyon, between Tortilla Flats and Apache Lake. Access to the project sites will be from both the west (Apache Junction/Tortilla Flats) and east (SR88/SR188 intersection). Planning and staging of the work between the 5 sites will be critical to successfully complete the work in the limited timeframe. In addition, this project requires technical expertise in compaction grouting, as well as specialized stone masonry work. A description of each project site and approximate quantities is as follows: Wall 1 work consists of compaction grouting, stone masonry wall repairs, and drainage work. Wall 1 will require approximately 22 cubic yards of cement grout, 190 linear feet of grout piping, 8 square yards of stone masonry repair, 70 square yards of clay ditch liner, 100 linear feet of ditch reconditioning, and 10 cubic yards of grouted riprap. Wall 2 work consists of construction of a 6’ to 18’ high reinforced concrete retaining wall with stone masonry facing and drainage work. Wall 2 will require approximately 2,700 square feet of retaining wall, 300 square yards of stone masonry facing, and 250 linear feet of ditch reconditioning. Wall 3 work consists of compaction grouting, stone masonry wall repairs, and drainage work. Wall 3 will require approximately 100 cubic yards of cement grout, 1000 linear feet of grout piping, 50 square yards of stone masonry repair, and 200 linear feet of ditch reconditioning. Site 1 work consists of construction of an 8’ high reinforced concrete retaining wall, a reinforced soil slope, and selective tree clearing. Wall at Site 1 will require approximately 2,300 square feet of retaining wall. Reinforced soil slope at Site 1 will require 430 square yards of geogrid, 170 cubic yards of excavation, and 170 cubic yards of unclassified borrow. Site 2 work consists of construction of a 10’ to 13’ high reinforced soil slope and drainage work. Site 2 will require approximately 1,500 square yards of geogrid, 450 cubic yards of excavation, 450 cubic yards of unclassified borrow, 40 cubic yards of riprap, and 100 linear feet of ditch reconditioning. In addition to the main roadway work, there will be temporary traffic control, construction surveying, temporary erosion control, and contractor testing. It is anticipated that this project will be advertised in mid July, 2010 with construction occurring from October 2010 to January 2011. Estimated cost $1.5 to $3.5 million.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-10-B-00023/listing.html)
- Place of Performance
- Address: Apache-Sitgreaves National Forest, Apache, Arizona, United States
- Record
- SN02216304-W 20100725/100723235501-7ee01a5cc094114186a2f2ac982fc782 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |