Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 17, 2010 FBO #3157
AWARD

Y -- RECOVERY--Y--PROJECT NUMBER 116, P116, STEAM PLANT AREA DECENTRALIZATION, NAVAL STATION NORFOLK, NORFOLK, VA

Notice Date
7/15/2010
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
N40085 NAVFAC MID-ATLANTIC HAMPTON ROADS IPT 9742 Maryland Avenue Norfolk, VA
 
ZIP Code
00000
 
Solicitation Number
N4008509R5083
 
Response Due
8/24/2009
 
Archive Date
7/31/2010
 
Point of Contact
CRYSTAL HUX, crystal.r.hux@navy.mil
 
Small Business Set-Aside
N/A
 
Award Number
N4008510C3065
 
Award Date
7/15/2010
 
Awardee
TETRA TECH TESORO, INC. (DUNS 119946515)5250 CHALLEDON DRIVEVIRGINIA BEACH, VA 23462
 
Award Amount
$12,162,112.00
 
Line Number
0001-0006
 
Description
The purpose of this contract is to reduce energy consumption while improving infrastructure. The project consists of Energy Conservation and Measures for lighting, water, retro commissioning, IR heat and mechanical retrofits, to include removing two hangars from the central steam system. Project will convert steam to natural gas, water conservation measures, and lighting retrofits. Steam to natural gas conversion will occur in the SP area and other mechanical work in the V area. Water conservation measures and lighting retrofits will occur in the SP, CEP, V area but not limited to those areas.This project converts thirty one (31) facilities from steam heating systems to natural gas heating systems. This project also converts two (2) facilities from steam heating systems to electric heating systems. The steam heating systems shall be replaced with natural gas fired high efficiency condensing type hot water boilers, and electric heating systems. This scope will include HVAC, Controls, Boiler/Mechanical Rooms, water conservation, lighting improvements, and automated meter reading.The HVAC portion will provide heating, ventilation, and air conditioning (HVAC) system upgrades involving equipment and ductwork. HVAC systems and upgrades for facilities included in this project shall attain the following objectives: Occupant comfort, Indoor air quality, Acceptable noise levels, Energy efficiency, Reliable operation, and Ease of maintenance. Design and installation shall be in accordance with IMC and UFC 3-400-10N, Mechanical Engineering. The Controls portion shall provide a Direct Digital Control (DDC) system and DDC upgrades to the existing DDC systems. DDC system upgrades and associated equipment shall be provided in accordance with the scope of work.The boiler portion will provide boiler/mechanical room additions for four (4) facilities include in this project necessary to accommodate the new boilers and associated equipment. This project will also provide a boiler/mechanical room extension for one (1) facility, SP233. The boiler/mechanical room additions shall be added to buildings SP-12, SP-29, SP-45, SP-383, and SP-356. New boiler/mechanical room additions shall be provided with unit heaters to prevent freezing and shall be provided with louvers and exhaust fans to allow ventilation in accordance with the design conditions indicated in this section.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62470HR/N4008509R5083/listing.html)
 
Record
SN02206376-W 20100717/100715234644-1e2ffdf36fe32520b6a3c1949aa17a7c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.